Building Your Own House: A Step-by-Step Guide

Lee has over two decades of hands-on experience remodeling, fixing, and improving homes, and has been providing home improvement advice for years.

house building assignment

  • Prepare Site
  • Plumbing and Electrical
  • Drywall and Painting
  • Interior Work
  • Exterior Work
  • How to Save

Building a house has an undeniable allure. A new house can be designed exactly to your specifications, so it's no surprise that most people would choose to build their own house if all other factors were the same.

Build your own home with the help of a licensed general contractor. Few non-professionals are qualified to act as their own general contractor (GC) . General contractors charge between 10- to 20-percent of the overall cost of the home build .

Prepare the Work Site

Preparing the house site is a collection of activities that must be done before the foundation can be laid.

  • Clearing : Clear the building site of brush and other debris, down to ground level and at least 25 feet around the planned house perimeter.
  • Surveying : Stake out and survey the lot , based on original drawings that indicate the property boundaries. Grade the site's topography to alter the water flow across the site.
  • Utilities : Temporary utilities are ordered from the power company and an electrician hooks up the utilities to a temporary electrical panel.
  • Waste: Order a dumpster to handle refuse during the building project.

Vladmir Godnik / Getty Images

Lay the Foundation

The building site takes shape with excavation and the installation of the foundation.

  • Excavation : The work site is excavated and graded.
  • Trenches : Trenches are dug for the foundation footings.
  • Footings : Concrete is poured for footings. Footing drains are constructed.
  • Foundation walls : Foundation walls are built on the footings, using poured concrete or concrete blocks.

Payments to the general contractor happen according to a draw schedule. Payments often correspond with major steps such as building the foundation or framing the home.

Frame the House

The framing carpenters put up the lumber framework for the floors, walls, and ceilings. Framing creates the basic shell of the house. The rough openings for windows, doors, and skylights are framed, too.

  • Sheathing and wrapping: The basic sheathing and wrapping of the wall and roof surfaces, plus exterior door and window installations, concludes this stage, rendering the inside of the home weathertight.
  • Windows : Depending on the house specs, the house may have one type of window or a combination, including double-hung, single-hung, slider, or fixed.

Zigy Kaluzny/Getty Images

Install the HVAC

HVAC (heating, ventilation, and air conditioning) is installed in the house while the walls and ceilings are open and accessible.

  • Ducting : Depending on the type of HVAC system you install, ducting will be installed in the ceilings, walls, and floors. Some HVAC systems are ductless .
  • Heating : Depending on the climate, a furnace may need to be installed to heat the entire house. Locational heating options include baseboard heaters, wall heaters, radiators, and underfloor radiant heating.
  • Air conditioning : Central air conditioning is best for whole-house cooling. Other air conditioner options include split (ductless) systems, portable air conditioners, or window-unit A/Cs.

Install Plumbing and Electrical

Electricians and plumbers rough-in the electrical circuits and plumbing pipes. Electrical and plumbing work starts before the wall, flooring, and ceiling surfaces are installed.

The electricians and plumbers will return after the walls and ceilings are in place, to complete the final connections of various fixtures.

Add the Insulation

Insulation is added to all exterior walls and ceilings to maintain an energy-tight home.

  • Wall insulation : Install insulation in the walls, using fiberglass, mineral wool, or other insulation types.
  • Ceiling insulation : Insulation batts or blown-in insulation is added to the ceiling.

Install Drywall and Paint Surfaces

Drywall is hung throughout the house. Later, all walls and ceilings are painted.

  • Drywall : Drywall is hung on wall and ceiling surfaces. The drywall seams are taped, mudded with joint compound, and sanded to a finish.
  • Painting : Walls are painted and ceilings are painted or finished with texture. Satin or eggshell gloss tends to be preferred for walls.

Finish the Interior

Complete the rest of the house interior, including cabinets, flooring, and trim.

  • Cabinets : Subcontractors install the kitchen and bathroom cabinets.
  • Countertops : The kitchen and bathroom countertops are installed. This job is done by countertop specialists who fabricate and install the countertops.
  • Flooring : Flooring is installed throughout the house. Floor covering options include carpeting, hardwood, laminate flooring, ceramic tile, luxury vinyl plank, and engineered wood flooring.
  • Molding : All trim moldings are installed, including baseboards, door and window casings, and crown moldings.

Complete the House Exterior

House exterior elements such as siding, roofing, windows, and landscaping are finished.

  • Roofing : Roofers add a long-lasting type of roofing material like composite shingles, torch-down asphalt, or standing seam metal, along with related roof flashings.
  • Chimney : Masons build the chimney if your home is designed to have one.
  • Siding : The house is sided with durable siding like fiber-cement siding, vinyl siding, metal siding, or manufactured veneer stone.

Complete Building the House

In the last stage of building a house, all work is wrapped up, inspections are made, and the keys are turned over to the homeowner.

  • Inspections : The contractor will arrange for final inspections by the permitting agencies .
  • Hook-ups : Installation and hook-up of finished electrical and plumbing fixtures are done.
  • Cleaning : Clean up the worksite by putting all acceptable debris into the dumpster. The contractor will hire a company that specializes in cleaning up after construction work. Call the disposal company to pick up the dumpster and specify that you do not need a replacement.
  • Walk-through : Schedule a final walk-through if you are using a general contractor. Arrange a final inspection by your lender, if you financed the building of your house with a construction loan.

Save Money Building a House

There are several ways to save money when building a house, including getting several estimates, using a stock design, and avoiding costly customizations. Another way is to do some of the work yourself after the builder has left or during lulls in the process:

  • Build patios and walkways
  • Plant trees , shrubs, and grass
  • Paint the house exterior
  • Paint the interior
  • Install window treatments
  • Install carpeting
  • Finish the basement

The main advantage of building a house is that you can design the house to your specifications, including layout, colors, materials, and more.

The main disadvantage of building a new house is its high cost. Expect to spend from $121,000 to over $500,000, on average, to build a new house.

How Much Does It Cost to Build a House? HomeAdvisor.

More from The Spruce

The 35 Steps to Building a House: Your Start-to-Finish Guide

  • House Hunting
  • New Constructions
  • Published on June 9th, 2023
  • 15 min read

Evette is just your average HGTV fan who dreams of having a home worthy of being on one of those shows. When she isn't writing for HomeLight, she's working at her local real estate office. In her downtime, you'll find her searching for the next great hiking trail in her area.

Taryn Tacher is the senior editorial operations manager and senior editor for HomeLight's Resource Centers. With eight years of editorial and operations experience, she previously managed editorial operations at Contently and content partnerships at Conde Nast. Taryn holds a bachelor's from the University of Florida College of Journalism, and she's written for GQ, Teen Vogue, Glamour, Allure, and Variety.

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Share by Email
  • Save to Pinterest

This is it — you’re finally making the move to build your very own house, and you couldn’t be more excited! It’s a huge decision, and it’s not one you’ve taken lightly. But do you know what goes into a new construction home , start to finish?

If not, don’t worry — we’ve got you covered. We’re going to break down all of the steps of building a house .

We have a lot of ground to cover, so grab a snack!

First thing: Talk to an expert!

A top local real estate agent will have connections to builders in the area and can offer a wealth of advice on how to navigate the whole process. Get the ball rolling by connecting to a highly rated agent through HomeLight today. It’s free, and it only takes a few minutes.

Steps 1-7: Finding, acquiring, and preparing the site

Step 1: find and purchase the lot.

The very first step to building a house is buying the ideal plot of land for your new dwelling.

Think about where you’d like to build. Do you want to live in the country with a large yard? Do you want to build a house in a growing development with a developer? Does the land already have access to utilities like water, sewer, and electricity?

Unfortunately, you can’t buy any old vacant lot — it must adhere to zoning ordinances where you want to build. Common zoning designations include:

  • Residential: Areas designated for single-family homes
  • Commercial: Areas designated for businesses like restaurants, retail shops, and so on
  • Industrial: Areas designated for factories
  • Rural: Areas designated for farming
  • Historical: Areas designated for the preservation of historical landmarks or buildings
  • Environmental: Areas designated for the protection of natural habitats
  • Aesthetic: Structures must adhere to a certain “look” as outlined by zoning codes
It’s easier to build a custom because you have more choices. You can build the house from the bottom up and in the way you want — you’ll have to pay accordingly. With a spec home, your options are limited. Contractors may only offer shades of white or certain cabinets. They’re basically cookie-cutter homes.

Step 2: Research the type of house you want

There are three types of builds available; spec homes, tract homes, or a fully custom home.

Spec (speculative) homes

Spec homes are single-family homes that are built in a development with no particular buyer in mind.

If you go under contract early enough on a spec home, you may be able to choose some features like flooring, paint, kitchen appliances, and other finishes.

Tract homes

Tract homes are when a developer buys a large plot of land and divides that land into individual lots. They’ll then construct homes from specific architectural options planned for that community.

Tract homes could include single-family homes, condos, or townhomes.

Custom homes

A custom home is where you have your own plot of land and hire a builder to build a house exactly the way you want it.

Russell Wing , a top-selling agent who has sold 83% more single-family homes than the average agent in Union County, North Carolina , shares insight on the benefits of a custom home.

“It’s easier to build a custom because you have more choices. You can build the house from the bottom up and in the way you want — you’ll have to pay accordingly. With a spec home, your options are limited. Contractors may only offer shades of white or certain cabinets. They’re basically cookie-cutter homes.”

Regardless of which type of home you want, you’ll want to look at the different floor plans available. Consider things like:

  • Number of bedrooms and bathrooms
  • Open floor plan or not?
  • The layout of the home
  • Number of levels or floors

Step 3: Research and hire the building team

Building a home is a huge project, and the average build will involve 22 subcontractors working on the home.

The first person you’ll need to hire is the general contractor or a custom home builder. They will oversee the construction of your home from start to finish. Their duties include:

  • Getting estimates for labor and materials
  • Vetting and hiring subcontractors (some will have a team of subcontractors they generally work with and will hire an outside subcontractor for electrical and plumbing work)
  • Assigning tasks to subcontractors
  • Making sure the team meets deadlines

Note: Custom home builders and general contractors are not the same thing, but they are very similar. A custom home builder draws up blueprints for the home and specializes in custom homes, whereas a general contractor does not.

Step 4: Get the required permits from the township

Before construction can begin, your contractor will contact your municipal office and discuss your plans. They’ll know what permits are necessary and they might already have a relationship with the municipality, which could help speed up the process.

Permits you will need could include:

  • Building permit ($1,200 to $2,000)
  • Electrical permit ($10 to $500)
  • Plumbing permit ($50 to $500)
  • HVAC permit ($250 to $400)
  • If a grading permit is needed ( $100 to $1,000 )

If you’re on a budget, you could get the permits yourself, but then you’ll be considered the contractor , and you would be liable if there’s a problem during construction or inspections.

Warning: Do not, under any circumstances, begin construction before obtaining permits! If the city learns that you do not have a permit , you could face increased fees to obtain the proper permits, and you could have to shut down construction until the permits are obtained, or even tear down work you’ve already completed.

Step 5: Clear the property

During this step, a professional land-clearing team will remove any debris, vegetation, trees, brush, and rocks within the intended build site.

When trees, shrubs, and bushes are removed, the team will also begin removing stump and root systems to prevent re-growth.

Note: If there are a lot of trees that need to be removed, you may have the option of selling the trees to a commercial logging company so they can be repurposed and turned into lumber.

Step 6: Level the site

Once the land is cleared, the clearing team will fill in any holes and level the ground. Then, the team will put up wooden stakes to market out where the foundation should be poured.

If the land has dips or hills , these will be graded to make sure there’s a flat surface to accommodate the house and driveway.

Step 7: Prepare the land for the foundation or basement

Using the wooden stakes as a guide, the team will dig holes and trenches for the foundation, utilities, and septic system if applicable.

Find a top real estate agent near you

We analyze over 27 million transactions and thousands of reviews to determine which agent is best for you based on your needs. It takes just two minutes to match you with the best real estate agents, who will contact you and guide you through the process.

Steps 8-14: Building the envelope

Step 8: install footings.

Footings can be made from concrete or brick masonry and are most commonly used with shallow foundations because it distributes the weight of vertical loads directly to the soil.  Footings are generally wider than the foundation itself and sit one foot below the frost line (the typical depth at which the soil freezes in your climate).

Footing drains will be constructed so that water drains away from the house and protects the drains from damage.

Step 9: Pour the foundation

With the footings in place, your home will have either a slab foundation, a crawlspace , or a full basement poured or constructed.

The concrete will go through a curing process to reach maximum strength. This can take anywhere from 28 to 60 days , but depending on weather conditions, the building can resume after one week.

Regardless of the type of foundation your home will have, it will have to be waterproofed.

Step 10: Install drains, sewers, taps

Once the foundation has cured, drains, sewer lines, water taps, and other plumbing that is needed on the first floor will be installed. Then, the contractors will fill in the trenches surrounding the foundation with excavated dirt.

Step 11: Have an inspection done on the foundation

After the footings, foundation, plumbing, and electrical basics have been laid, there will be an inspection to make sure the foundation was done correctly and follows local code requirements.

Some things the inspector will look at typically include:

  • The footing’s width, depth, and condition
  • Waterproofing
  • Reinforced bars

Step 12: Build the frame of the house

Once the inspector gives the project the green light, next comes the framing.

This is where you’ll finally see your home take shape. The framing crew will erect lumber for the walls, flooring, ceiling, and roof trusses. This step could take between one and two weeks to complete.

Step 13: The sheathing is applied to exterior walls

The sheathing is the large sheets of wood, oriented strand board, wafer board, or exterior gypsum that’s nailed to the frame. It’s recommended to use half-inch panels to give the structure more strength.

In some cases, insulation sheathing (rigid foam or cellulose-fiber panels) may be used to improve insulation. This type can be attached directly to the studs, below the wood sheathing. It could also be attached on top of the wood sheathing.

Next, the sheathing is covered with house wrap, a protective cover that prevents moisture from seeping into the underlying wood, preventing mold and wood rot.

Step 14: Install windows and exterior doors

With the sheathing attached to the bones of the house, the windows and doors can be installed.

When you’re shopping for windows and doors, look for energy-efficient windows with the Energy Star label . Energy-efficient windows and doors will help lower energy costs by keeping the temperature indoors consistent, no matter the temperature outdoors.

Steps 15-22: Installing critical systems

Step 15: install hvac system.

The HVAC technician will come in to install ductwork throughout the house. The air handler, condenser, and trim work will be installed as well.

Step 16: Rough plumbing

A plumber will come in and run pipes to the bathrooms, kitchen, and laundry room. They will also install sewer lines, vents, and bathtubs.

This step can be done while the doors and windows are being installed.

Step 17: Have an inspector evaluate the new plumbing

Although a licensed plumber may have done the work, an inspector will have to come in and inspect the work to make sure everything is done correctly.

The inspector will look for leaks and will ensure that the drains, sewage, and vent pipes pass a pressure test.

Step 18: Install electrical wires and panels

This stage is when all of the electrical work is done.

The wires are run through the walls and ceilings. The HVAC is hooked up (including the thermostat), and the fans, lights, electrical outlets, external electrical work, and the circuit breaker are also hooked up and ready to go.

Step. 19: Get an HVAC and electrical inspection

Once the HVAC and electrical work are complete, an inspector will come out and make sure these systems work properly and are completed to code.

Step 20: The roof is put on the home

The sheathing for the roof is generally done when the exterior sheathing is attached to the walls.

During this stage, the roof will be completed. Roofers will install the flashings and asphalt shingles — but other materials may be used , such as clay or concrete tile, slate, metal, or wood.

Step 21: Insulation is installed

The type of insulation your home will need is going to depend on your location.

Usually, insulation is applied to interior walls, the attic, basement, crawl space, and exterior walls (if it wasn’t applied before the sheathing).

The most common types of insulation are fiberglass, cellulose, or foam spray insulation.

Fiberglass insulation is used in unfinished walls, floors and ceilings. It comes in rolls and is installed in-between studs, joists, and beams. The average cost for fiberglass insulation is between $0.30 to $1.50 per square foot.

Cellulose insulation is used in existing and enclosed walls, or new open cavities in the wall. This insulation can be used in unfinished attic floors and other hard to reach places. This type of insulation can be poured, but is usually blown into place using special equipment. The average cost of cellulose insulation is about $1.20 per square foot.

Foam spray insulation is much like cellulose insulation, as it can be applied in enclosed, existing walls, new wall cavities, and unfinished attic floors. It is applied using a spray container (for smaller areas) or a pressure spray product (for larger areas). The average cost of foam spray insulation is between $0.44 to $6.00 per square foot.

Step 22: Drywall is hung

Drywall is hung throughout the interior of the house, as well as on the ceiling.

Step 22b: The walls and ceiling are textured

After the drywall is hung, a texture may be sprayed on the drywall. Then the walls are primed so they can be painted.

Steps 23-32: Adding your design touches

Step 23: walls are painted.

We’re nearing the final steps to building a house!

At this stage, the walls will be painted, and it’ll start feeling a little more like your home.

If you’re going with a spec or tract home, you may not have many choices in paint color, but if it’s a custom home, you could have your choice of colors, or even have wallpaper put on the walls.

Step 24: Exterior finishes are installed

There are different types of siding that can be applied to your home.

Vinyl siding is the cheapest siding material ($7.50 to $15 per square foot) and the most common material used for spec and tract homes. However, if you’re going custom, other options include:

  • Wood ($10.50 to $17.50 per square foot)
  • Fiber cement ($10.50 to $17.50 per square foot)
  • Stucco ($10.50 to $18.50 per square foot)
  • Brick ($12.50 to $22.50 per square foot)
  • Metal ($7.50 to $25.00 per square foot)
  • Stone ($17.50 to $45.00 per square foot)

Step 25: Flooring is laid throughout the house

Once the paint has dried, flooring is laid throughout the house.

Sometimes you won’t have a choice what type of flooring you’ll get if you’re going with a spec or tract home; however, with a custom home, the sky’s the limit!

Step 26: Window sills and trim are completed

When the flooring has been laid, next comes the trim.

Trim will be installed around the windows and doors, along the floor, and if you choose, around the ceiling, too (that’s called crown molding and can add a sophisticated look to any room).

Step 27: Cabinets and vanities are installed

Vanities and cabinets are the next things to be installed in your home.

Spec and tract homes typically come with builder-grade cabinetry , which is the most basic (and affordable) type of cabinetry you can get that still looks good.

You can opt for higher quality cabinets and vanities, but that will affect your budget. Custom cabinets can cost between $500 to $1,200 per linear foot !

Step 28: Light fixtures, outlets, and switches are installed

After the electrical work is finished, light fixtures, outlets, and switches are hooked up.

These features can be customized to match your personal style, but you can also opt for plain white ones and upgrade down the road if you choose.

Step 29: Countertops and appliances are installed in the kitchen

Countertops and appliances are the next things to go in. There are a variety of countertops you can choose from, but the most popular include:

  • Quartz ($50 to $200 per square foot)
  • Granite ($40 to $100 per square foot)
  • Marble ($40 to $100 per square foot)
  • Laminate ($40 to $80 per square foot)
  • Solid surfacing ($52 to $120 per square foot)
  • Recycled glass ($60 to $150 per square foot)
  • Butcher block ($50 to $100 per square foot)

Step 30: Bathroom fixtures are installed

Bathroom fixtures such as faucets, showerheads, toilets, heat register covers, and other features are added during this phase.

Step 31: Mirrors are hung

Along with bathroom fixtures, mirrors are hung in the bathroom and other spaces, including walk-in closets, bedrooms, and workout rooms (if in a custom home).

Step 32: Landscaping and hardscaping is completed

You took so much care into what goes in the house; you can’t forget about the exterior!

A professional landscaper can come in and lay down sod, plant trees, or flowers. They’ll install walkways, build decks or patios, create garden walls, and so much more.

This is your chance to make your yard an oasis that leaves your neighbors green with envy!

Steps 33-35: The home stretch

Step 33: final home inspection.

The final home inspection is where a home inspector looks over everything.

They’ll double-check the plumbing, electrical, and HVAC systems. They’ll inspect doors, windows, the foundation, the roof, and more. If the structure passes the inspection, they’ll give you a certificate of occupancy , which means it’s inhabitable and safe to live in.

If there are any issues, another inspection may be required after those problems have been fixed.

Step 34: Final walkthrough

The final walkthrough is your opportunity to go through the house and make sure everything is as you requested.

You’ll want to pay close attention to the details and take note of anything that isn’t what you discussed or approved with your contractor. You’ll also want to look for any signs of damage that may have occurred during the final stages of construction, such as gouges in countertops, dented or scratched appliances, deep scratches on the hardwood floors, or damaged walls.

Step 35: Closing

If everything passes inspection and you don’t find any problems that need to be addressed during the final walkthrough , you can begin the closing process on the home. Hurray!

Don’t be overwhelmed by the steps to build a house

The average homebuyer looks at at least 5 homes in 10 weeks before submitting an offer on a house. There are times when they can’t find a house they want to buy and they’ll go with a new build. In April 2023, 1,416,000 permits for new construction homes were issued across the United States.

If you decide that new construction is right for you, but you’re uncertain about what type of new build you’d like to go with, look at your budget and try to decide the level of customization you want and how much house your budget will allow for.

“You can go to a tract home and get a lot more square footage for the money than you could with a custom build. It’s a cookie-cutter home, and the quality may not be as good as a custom build, but building custom is harder today because the price of materials has skyrocketed,” Wing advises.

If customization isn’t high on your list, a tract home or spec home is a great option. However, if you want a house that reflects your personality from the moment you sign the closing papers, then a custom home is the way to go!

Header Image Source: (Jens Behrmann / Unsplash)

  • "Building on Vacant Land: Zoning Issues You Might Face," Nolo (March 2014)
  • "What types of contractors will you need to build your home?," Nationwide (February 2023)
  • "When Homeowners Must Obtain Permits for Home Projects," Nolo (December 2013)
  • "5 Construction Laws to Know Before You Build a House," This Old House (December 2019)
  • "How Is Land Clearing Done?," Mr. Tree Inc. (November 2019)

At HomeLight, our vision is a world where every real estate transaction is simple, certain, and satisfying. Therefore, we promote strict  editorial integrity in each of our posts.

Evette Zalvino

Contributing Author

Taryn Tacher

Senior Editor

First steps for buying a home

First-time home buyer tips

How to pick a real estate agent when buying

Dos and don’ts when buying a home

Is it cheaper to build or buy a house?

New construction homebuying process

23 questions when buying a new construction home

Cheapest way to build a house

Do you need an agent to buy a new build?

Talk to an expert

Cost to build a house in 2023

Cost to build a house in Texas

Cost to build a house in Florida

Cost to build a house in California

Cost to build a house in Michigan

Cost to build a house in Georgia

Cost to build a house in Massachusetts

Cost to build a house in North Carolina

Build a Model Cardboard House

license

Introduction: Build a Model Cardboard House

Build a Model Cardboard House

In this project we will be building a model house out of cardboard! Having a visual representation or model of structures can make it a lot easier for people to understand your design. This project is particularly for students in grades 9-12 - at the high school level students should already have a lot of experience in recognizing different structures, but we want to look at these structures in greater depth. One aspect of this is having students design structures and make models of them, which is what we will focus on in this project.

The plan here is to use a common/ easily-available object as a sort of pre-fabricated structure and then build off of it. In particular this project uses a tissue box, which we can imagine as a shed or popular tiny home or other structure, and then we will alter that structure to give it a new intended use: a larger inhabitable space.

This project works with STL #20 which states that "students will develop an understanding of and be able to select and use construction technologies."

We will look specifically at benchmarks M and N:

M. Structures require maintenance, alteration, or renovation periodically to improve them or to alter their intended use.

N. Structures can include pre-fabricated materials.

Learning Objectives:

- Learn the importance of alterations and renovations in construction, and why they might be necessary

- Utilize tools to produce a visual model of a structure

Step 1: Gathering Materials

Gathering Materials

For this project you will need: - Tissue box - Scrap cardboard/ cardboard boxes - Printer paper - Liquid glue & glue sticks - Ruler - X-Acto knife - Pen - Pencil - Scissors

Cost Estimation:

Tissues..................$1.64

Scissors.................$4.88

Glue........................$3.48

Ruler.......................$0.99

X-Acto knife.........$3.67

Step 2: Sketching & Planning

Sketching & Planning

The tissue box being utilized is 4-3/8" x 4-3/8" x 5", so we want to try and keep this scale when building our house. I have designed a two-story house that will almost triple the width of our "pre-fabricated structure" (the tissue box) and meet the requirements of a larger inhabitable space. The sketch above gives elevation views of each side of the house (front, right, back, and left) as well as measurements of walls lengths and planned location of windows and doors.

Step 3: Measuring Out the Pieces

Measuring Out the Pieces

Once we have the plan of what we want the house to look like and how big it will be, we can start transferring that information to the cardboard. Use a ruler to measure out the correct dimensions for each piece, and use a pencil to mark those dimension lines. We will have 8 pieces for the base of the house: - One 11-7/8” x 11-1/2” - One 6” x 11-1/2” - One 8-1/4” x 10-1/2” - One 5-3/4” x 10-1/2” - One 1-1/2” x 10-1/2” - One 4-3/8” x 5-1/2” - Two 3-1/8” x 6-1/2” Use the scissors to cut out each of these pieces, and optionally use the X-Acto knife to trim off any jagged edges. As you cut out each piece it is a good idea to write the dimensions of them on their backs so that they can be easily found later on.

(Our roof pieces will be measured and cut out in a later step.)

Step 4: Cut Out Space for the Roof

Cut Out Space for the Roof

Several of our pieces will need to be cut at an angle to make room for the slope of the roof we are going to construct. Start with the 6” x 11-1/2” piece - mark at the top of the piece where the midpoint is, which should be at 3”. We will draw a horizontal line an inch (1”) down from the top of the piece, and the draw a diagonal line on either side from the midpoint down to the endpoints of that line. Then cut off the two triangles made in each corner.

This same process will be repeated for 3 other pieces.

On the 11-7/8” x 11-1/2” piece, first mark a point six inches (6”) from the left edge to represent the opposite wall of the piece we just cut. Since these two wall segments should be equal, use the same 3” midpoint mark and draw two diagonal lines down to the endpoints. The one inch (1”) line down from the top will be cut off as well, from the six inch mark to the other side of the piece. This is shown in the third image above.

The other two pieces have the same dimensions - the midpoint will be half of 3-1/8", so mark at 1-9/16" and cut the diagonal so it reaches your one inch (1") mark.

Step 5: Assembling the Pieces

Assembling the Pieces

Once we have our 8 pieces cut out we can start to assemble them and glue them together. We will look at our design plan to make sure we have them connected in the correct layout. For assembly, put glue along the edges of the pieces and hold them together until the glue starts to get a bit tacky. Connect the tissue box to the back wall in this step, applying a layer of glue on one side of the box and aligning it with the edge of the wall.

Step 6: Making a Base

Making a Base

To make our house construction sturdy, we will add a base beneath the whole structure. Begin by taking a large sheet of cardboard and placing the house base on top of it. Using a pencil, trace an outline of the house about an inch out from the walls. Once you have your outline you can cut out the shape and then add glue to the bottoms of the walls and stick them to the base.

Step 7: Measuring Out the Roof

Measuring Out the Roof

We will create a simple gable roof that utilizes 4 separate pieces. To get a new texture for roof shingles we can remove the top layer of cardboard, thus revealing the ridges in-between the layers. Flip the ridges over so that we can mark our measurements along the smooth side.

Two pieces will be made for the 6" wall, and two pieces will be made for the 4-3/8" wall (on top of the tissue box). The former will have the dimensions of 3-1/2" x 8-1/2" - having them equal slightly over 6" will allow for an eave, which is an overhang of the roof over the wall face. Glue these along the diagonal cuts we made earlier.

The latter two pieces will have the dimensions of 2-1/4" x 9", also creating an eave. We also have to account for the diagonal created by our roof pieces we've already glued in place. Since this is the case, we will start at one corner and draw a 4-1/8" diagonal line as shown in the above picture. We will cut this triangle off and repeat the process, albeit opposite, on the remaining piece. Then just glue these down.

Step 8: Making Doors and Windows

Making Doors and Windows

Our design has 4 doors - one on our "original" building (the tissue box), one on the second floor above the tissue box, one on the right side of the house, and a final door in the back. Each of these will be 1-3/4" x 4-1/8", except for our second floor door. Since this one will be a double sliding door it will be a bit wider, specifically 2-1/2" x 4-1/8". Once these are cut out you may use a marker or pen to draw details - I added a frame and door handles.

This design also has a lot of windows, coming in at 23 - two sizes of double-hung windows, fixed windows for next to the doors on the front of the house, and rounded windows for under the roof.

The smaller double-hung windows (with the 2x2 grid design) are dimensioned as 1-1/2" x 1-1/2" and there will be 15 of these. The larger double-hung windows (with 3 panels) are dimensioned as 2-1/2" x 1-1/2" and we will have 3 of these. There's a total of 5 fixed windows, dimensioned as 1" x 2-1/2", and 2 rounded windows that have a diameter of 1" each. The same marker or pen may be used to draw the frame as well as the panes of glass.

Step 9: Making a Balcony & Attaching Elements

Making a Balcony & Attaching Elements

Cut out a piece of cardboard that is 1" x 6-1/4" - this will act as our balcony railing. An inch (1") in on either side, use the X-Acto knife to create a vertical slice, but do not go all the way through. These will be our folding lines - from here simply glue to the top of the tissue box and the front wall.

At this point we can also attach our doors and windows! Reference the initial plan and the photos above so that there are 10 windows in the front, 4 windows on the left side, 4 windows on the right side, and 6 windows in the back. Make sure to keep them level, and have a bit of space in-between the levels so that it looks like a two-story house.

Step 10: Finish!

Finish!

Recommendations

"DUCKY" Toddler Costume

Outdoor Life Contest

Outdoor Life Contest

Farm to Table Contest

Farm to Table Contest

Building a house

This worksheet originally published in Learn Science! for grades K-2 by © Dorling Kindersley Limited .

GreatSchools Logo

Yes! Sign me up for updates relevant to my child's grade.

Please enter a valid email address

Thank you for signing up!

Server Issue: Please try again later. Sorry for the inconvenience


Yes, a number of professional custom homebuilders and residential project managers have asked to buy the Microsoft Project file that was used to create the new house construction schedule shown on this page. In response to these requests, we are providing sample construction scheduling files for you to review so that you can determine if your residential construction company might benefit from using a scheduling program to help manage your home building business.

]

How long does it take to build a house? Scroll down this page to see an example of a typical construction schedule for a large custom home. It was produced using Microsoft Project® scheduling software and includes most, but not all, of the activities involved in the process of building a new house in Maryland. Sample construction draws have been included for reference purposes, although individual will most likely have their own draw schedules.

Notice that because construction draws from the lender typically follow the completion of various phases, or milestones, the cash flow on a project can be very irregular. While the money flowing out of a construction company; for employee salaries, benefits, office space, vehicles, insurance, equipment and other company expenses, typically occurs on a regular calendar based timeline, the money used to pay these expenses follows an event driven schedule. Therefore, besides the "normal" unplanned events that can affect the progress of a home building project, it is not uncommon for home builders to rearrange construction schedules in order to gain access to draw money so that they are able to pay subcontractors and suppliers in a timely manner. By the way, this is generally a good thing (provided you have an honest builder) because subcontractors tend to follow the money and happy subs are almost always preferable to unhappy ones:-)

Probably not; most home building projects will take less time, but some will take even more. For example, the timeline for a smaller house, with few options and less detailed finishes, which has been built many times before by professional builders, might be as short as 8 to 12 weeks. However, 6 to 9 months from start to finish is probably a more realistic average ( ). While a larger house, with more options, custom features, fancier finishes, and more owner involvement - especially if the owner has little construction experience - may very well take 1 1/2 to 2 years to complete. Then again, if you build your own house, and make the common mistake of moving in before every last detail is finished, well, you might be looking at decades instead of months or years — I speak from experience, but it's just a little trim in the powder room, and a short piece of baseboard behind the master bath door, and a small piece of molding in the hallway linen closet, and....

The actual schedule of completion for your specific project will vary based upon many factors including, but not limited to, size and degree of difficulty of the structure, site and weather conditions, material and contractor availability, crew sizes, effective scheduling and communication, the knowledge and experience of those managing the project, and perhaps most significantly, the number, timeliness, and complexity of the changes you will inevitably make to the original contract after construction has already begun.

Good luck with your project, thank you for visiting , and have fun building!

Outline Number Name Duration Predecessors Start Finish
1 1Contracts0.00d.Thu 6/5/14Thu 6/5/14
2 1.1  -   Supply Lot Sale Agreement0.00d.Thu 6/5/14Thu 6/5/14
3 1.2  -   Supply Construction Agreement0.00d.Thu 6/5/14Thu 6/5/14
4 1.3  -   Supply Contract Plans0.00d3Thu 6/5/14Thu 6/5/14
5 1.4  -   Supply Contract Specifications0.00d3Thu 6/5/14Thu 6/5/14
6 1.5  -   Supply Contract Site Plan0.00d3Thu 6/5/14Thu 6/5/14
7 1.6  -   Secure Financing0.00d.Thu 6/5/14Thu 6/5/14
8 1.7  -  Construction Loan Settlement0.00d.Thu 6/5/14Thu 6/5/14
9 2Document Review & Revision25.00d.Thu 6/5/14Wed 7/9/14
10 2.1  -  Review & Finalize Plans15.00d4Thu 6/5/14Wed 6/25/14
11 2.2  -  Review & Finalize Specifications20.00d5Thu 6/5/14Wed 7/2/14
12 2.3  -  Review & Finalize Site Plan1.00d6,10Thu 6/26/14Thu 6/26/14
13 2.4  -  Print Construction Drawings5.00d10,11,12Thu 7/3/14Wed 7/9/14
14 2.5  -  Approve Revised Plans0.00d13Wed 7/9/14Wed 7/9/14
15 2.6  -  Approve Revised Specifications0.00d13Wed 7/9/14Wed 7/9/14
16 2.7  -  Approve Revised Site Plan0.00d13Wed 7/9/14Wed 7/9/14
17 3Bids & Contracts24.00d.Thu 7/10/14Tue 8/12/14
18 3.1  -  Make Copies of Plans3.00d14Thu 7/10/14Mon 7/14/14
19 3.2  -  Make Copies of Specifications2.00d15Thu 7/10/14Fri 7/11/14
20 3.3  -  Distribute Plans & Specifications1.00d18,19Tue 7/15/14Tue 7/15/14
21 3.4  -  Receive Bids10.00d20Wed 7/16/14Tue 7/29/14
22 3.5    Review Bids5.00d.Wed 7/30/14Tue 8/5/14
25 3.6  -  Execute Subcontractor Agreements5.00d23Wed 8/6/14Tue 8/12/14
26 4Grading & Building Permits17.00d.Thu 7/10/14Fri 8/1/14
27 4.1  -  Schedule lot stake-out1.00d13Thu 7/10/14Thu 7/10/14
28 4.2  -  Stake lot1.00d27FS+3dWed 7/16/14Wed 7/16/14
29 4.3  -  File Grading Permit Application1.00d16Thu 7/10/14Thu 7/10/14
30 4.4  -  File Building Permit Application3.00d14,15,16Thu 7/10/14Mon 7/14/14
31 4.5  -  Post Lot Identification1.00d28,29,30Thu 7/17/14Thu 7/17/14
32 4.6  -  Meet Sed. Control Insp.1.00d29FS+2d,28,31Fri 7/18/14Fri 7/18/14
33 4.7  -  Walk Lot w/ Owner1.00d32Mon 7/21/14Mon 7/21/14
34 4.8  -  Install Construction Entrance1.00d32,33Tue 7/22/14Tue 7/22/14
35 4.9  -  Install Sediment Controls2.00d32,33Tue 7/22/14Wed 7/23/14
36 4.10  -  Sediment Control Insp.1.00d34,35Thu 7/24/14Thu 7/24/14
37 4.11  -  Grading Permit Issued1.00d36Fri 7/25/14Fri 7/25/14
38 4.12  -  County Permit Process10.00d30Tue 7/15/14Mon 7/28/14
39 4.13  -  Building Permit Approved1.00d38,37Tue 7/29/14Tue 7/29/14
40 4.14  -  Pay Permit Fees and Excise Taxes1.00d39FS+2dFri 8/1/14Fri 8/1/14
41 4.15  -  Building Permit Issued0.00d40Fri 8/1/14Fri 8/1/14
42 5Site Work7.00d.Mon 7/28/14Tue 8/5/14
43 5.1  -  Clear Lot3.00d37Mon 7/28/14Wed 7/30/14
44 5.2  -  Strip Topsoil & Stockpile1.00d43Thu 7/31/14Thu 7/31/14
45 5.3  -  Stake Lot for Excavation1.00d43Thu 7/31/14Thu 7/31/14
46 5.4  -  Rough grade lot1.00d43,45Fri 8/1/14Fri 8/1/14
47 5.5  -  Excavate for foundation2.00d39,45,43,46Mon 8/4/14Tue 8/5/14
48 6Foundation24.00d.Wed 8/6/14Mon 9/8/14
49 6.1  -  Layout footings1.00d47Wed 8/6/14Wed 8/6/14
50 6.2  -  Dig Footings & Install Reinforcing1.00d49Thu 8/7/14Thu 8/7/14
51 6.3  -  Footing Inspection0.00d50Thu 8/7/14Thu 8/7/14
52 6.4  -  Pour footings1.00d51Fri 8/8/14Fri 8/8/14
53 6.5  -  Pin Footings1.00d52Mon 8/11/14Mon 8/11/14
54 6.6  -  Stock Block, Mortar, Sand1.00d53Tue 8/12/14Tue 8/12/14
55 6.7  -  Build Block Foundation15.00d53,54Wed 8/13/14Tue 9/2/14
56 6.8  -  Foundation Certification0.00d55Tue 9/2/14Tue 9/2/14
57 6.9  -  Draw #1 (Location Survey)0.00d56Tue 9/2/14Tue 9/2/14
58 6.10  -  Fill Block Cores w/ Concrete1.00d55Wed 9/3/14Wed 9/3/14
59 6.11  -  Steel Delivery1.00d58Thu 9/4/14Thu 9/4/14
60 6.12  -  Set Lintels, Bolts, Cap Block2.00d59Fri 9/5/14Mon 9/8/14
61 6.13  -  Lumber Delivery1.00d58Thu 9/4/14Thu 9/4/14
62 6.14  -  Waterproofing and Drain Tile1.00d61Fri 9/5/14Fri 9/5/14
63 7Rough Carpentry44.00d.Tue 9/9/14Fri 11/7/14
64 7.1  -  Set Steel1.00d60Tue 9/9/14Tue 9/9/14
65 7.2  -  1st Floor Deck Framing4.00d64Wed 9/10/14Mon 9/15/14
66 7.3  -  1st Floor Wall Framing4.00d65Tue 9/16/14Fri 9/19/14
67 7.4  -  Draw #2 (First Floor Deck)0.00d66Fri 9/19/14Fri 9/19/14
68 7.5  -  2nd Floor Deck Framing2.00d67Mon 9/22/14Tue 9/23/14
69 7.6  -  Draw #3 (Second Floor Deck)0.00d68Tue 9/23/14Tue 9/23/14
70 7.7  -  2nd Floor Wall Framing3.00d69Wed 9/24/14Fri 9/26/14
71 7.8  -  Set Roof Trusses2.00d70Mon 9/29/14Tue 9/30/14
72 7.9  -  Frame Roof7.00d71Wed 10/1/14Thu 10/9/14
73 7.10  -  Install Roof Plywood5.00d72Fri 10/10/14Thu 10/16/14
74 7.11  -  Install Windows & Doors2.00d73,111Wed 10/22/14Thu 10/23/14
75 7.12  -  Frame Basement3.00d72,81Fri 10/10/14Tue 10/14/14
76 7.13  -  Frame Basement Bulkheads2.00d75,87,93Thu 11/6/14Fri 11/7/14
77 8Concrete Slabs8.00d.Thu 9/18/14Mon 9/29/14
78 8.1  -  Basement Slab Preparation2.00d65,91Thu 9/18/14Fri 9/19/14
79 8.2  -  Termite Treatment Basment Slab1.00d78Mon 9/22/14Mon 9/22/14
80 8.3  -  Slab Inspection1.00d79Tue 9/23/14Tue 9/23/14
81 8.4  -  Pour Basement Slab1.00d80Wed 9/24/14Wed 9/24/14
82 8.5  -  Prep Garage Slab1.00d81Thu 9/25/14Thu 9/25/14
83 8.6  -  Termite Treatment Garage Slab1.00d82Fri 9/26/14Fri 9/26/14
84 8.7  -  Pour Garage Slab1.00d83Mon 9/29/14Mon 9/29/14
85 9H.V.A.C.17.00d.Fri 10/10/14Mon 11/3/14
86 9.1  -  HVAC Layout & Measure1.00d72Fri 10/10/14Fri 10/10/14
87 9.2  -  HVAC Rough-in5.00d86,111Wed 10/22/14Tue 10/28/14
88 9.3  -  HVAC Set Indoor Units2.00d81,87Wed 10/29/14Thu 10/30/14
89 9.4  -  HVAC Temporary Heat2.00d88Fri 10/31/14Mon 11/3/14
90 10Plumbing Rough-in37.00d.Tue 9/16/14Wed 11/5/14
91 10.1  -  Plumbing Sub-slab2.00d65Tue 9/16/14Wed 9/17/14
92 10.2  -  Plumbing Layout1.00d91,87Wed 10/29/14Wed 10/29/14
93 10.3  -  Plumbing rough-in5.00d92Thu 10/30/14Wed 11/5/14
94 11County Plumbing Sub-slab Inspection0.00d91Wed 9/17/14Wed 9/17/14
95 12County Plumbing Rough-in Inspection0.00d93Wed 11/5/14Wed 11/5/14
96 13Electric Rough-in19.00d.Fri 10/24/14Wed 11/19/14
97 13.1  -  Set Electric Boxes2.00d74Fri 10/24/14Mon 10/27/14
98 13.2  -  Install Electric Service Panel2.00d97Tue 10/28/14Wed 10/29/14
99 13.3  -  Electrical Walk-through1.00d98Thu 10/30/14Thu 10/30/14
100 13.4  -  Electrical Rough-wire14.00d99Fri 10/31/14Wed 11/19/14
101 14Specialty Rough-ins5.00d.Thu 11/20/14Wed 11/26/14
102 14.1  -  Central Vacuum Rough-in5.00d100Thu 11/20/14Wed 11/26/14
103 14.2  -  Alarm System Rough-in5.00d100Thu 11/20/14Wed 11/26/14
104 14.3  -  Telephone System Rough-in5.00d100Thu 11/20/14Wed 11/26/14
105 14.4  -  Television System Rough-in5.00d100Thu 11/20/14Wed 11/26/14
106 14.5  -  Audio Visual Rough-in5.00d100Thu 11/20/14Wed 11/26/14
107 15County Electrical inspection0.00d96,101Wed 11/26/14Wed 11/26/14
108 16Draw #5 (Rough-ins complete)0.00d95,107Wed 11/26/14Wed 11/26/14
109 17County Framing Inspection0.00d95FS+1d,107FS+1dThu 11/27/14Thu 11/27/14
110 18Roofing68.00d.Fri 10/17/14 Tue 1/20/15
111 18.1  -  Roofing Paper Installed3.00d73Fri 10/17/14Tue 10/21/14
112 18.2  -  Draw #4 (Roof, windows, doors)0.00d74,111Thu 10/23/14Thu 10/23/14
113 18.3  -  Stock Roof Shingles1.00d112Fri 10/24/14Fri 10/24/14
114 18.4  -  Install Roof Shingles7.00d113,119 Mon 1/12/15 Tue 1/20/15
115 19Exterior Finishes56.00d.Fri 10/24/14 Fri 1/9/15
116 19.1  -  Siding3.00d74Fri 10/24/14Tue 10/28/14
117 19.2  -  Exterior Trim7.00d116Wed 10/29/14Thu 11/6/14
118 19.3  -  Brick Arch Forms1.00d117Fri 11/7/14Fri 11/7/14
119 19.4  -  Brick Veneer45.00d118Mon 11/10/14 Fri 1/9/15
120 20Insulation5.00d.Fri 11/28/14Thu 12/4/14
121 20.1  -  Caulk & Air Seal1.00d109Fri 11/28/14Fri 11/28/14
122 20.2  -  Draft & Fire Stop1.00d121Mon 12/1/14Mon 12/1/14
123 20.3  -  Batt Insulation3.00d121,122Tue 12/2/14Thu 12/4/14
124 21County Insulation Inspection0.00d123,120Thu 12/4/14Thu 12/4/14
125 22BGE Energy Wise Inspection0.00d124Thu 12/4/14Thu 12/4/14
126 23Drywall26.00d.Fri 12/5/14 Fri 1/9/15
127 23.1  -  Stock Drywall1.00d124Fri 12/5/14Fri 12/5/14
128 23.2  -  Hang Drywall5.00d127Mon 12/8/14Fri 12/12/14
129 23.3  -  Remove Scrap Drywall1.00d128Mon 12/15/14Mon 12/15/14
130 23.4  -  Tape and Finish Drywall15.00d128,129Tue 12/16/14Mon 1/5/15
131 23.5  -  Sand Drywall1.00d130Tue 1/6/15Tue 1/6/15
132 23.6  -  Drywall Point-up3.00d131Wed 1/7/15Fri 1/9/15
133 24Draw #6 (Insulation & drywall applied)0.00d128,126Fri 1/9/15Fri 1/9/15
134 25Floor Finishes76.00d.Tue 1/13/15Tue 4/28/15
135 25.1  -  Ceramic Tile15.00d142Tue 1/13/15Mon 2/2/15
136 25.2  -  Install Hardwood Floor4.00d146Fri 3/27/15Wed 4/1/15
137 25.3  -  Sand, Stain, Seal Hardwood5.00d196Thu 4/16/15Wed 4/22/15
138 25.4  -  Install Carpet4.00d137Thu 4/23/15Tue 4/28/15
139 25.5  -  Final Coat Hardwood2.00d196Thu 4/16/15Fri 4/17/15
140 26Paint59.00d.Wed 1/7/15Mon 3/30/15
141 26.1  -  Prep Drywall for Prime Coat2.00d131Wed 1/7/15Thu 1/8/15
142 26.2  -  Prime Paint Drywall2.00d141Fri 1/9/15Mon 1/12/15
143 26.3  -  Prep Trim for Prime Coat2.00d142,152Wed 1/21/15Thu 1/22/15
144 26.4  -  Prime Trim2.00d143Fri 1/23/15Mon 1/26/15
145 26.5  -  Finish Coat Trim10.00d144,156Mon 2/23/15Fri 3/6/15
146 26.6  -  Finish Coat Drywall14.00d145,132Mon 3/9/15Thu 3/26/15
147 26.7  -  Caulk Exterior Windows & Doors1.00d146,117Fri 3/27/15Fri 3/27/15
148 26.8  -  Finish Coat Exterior Trim & Siding1.00d147Mon 3/30/15Mon 3/30/15
149 27Draw #7 (Roofing, masonry, siding)0.00d114,157Tue 3/31/15Tue 3/31/15
150 28Interior Trim29.00d.Tue 1/13/15Fri 2/20/15
151 28.1  -  Interior Trim Delivery1.00d142Tue 1/13/15Tue 1/13/15
152 28.2  -  Install Interior Doors5.00d151Wed 1/14/15Tue 1/20/15
153 28.3  -  Install Interior Trim15.00d152Wed 1/21/15Tue 2/10/15
154 28.4  -  Install Cabinetry5.00d153Wed 2/11/15Tue 2/17/15
155 28.5  -  Install Appliances1.00d154Wed 2/18/15Wed 2/18/15
156 28.6  -  1st Punch-out Interior Trim2.00d155,144Thu 2/19/15Fri 2/20/15
157 29H.V.A.C. Trim1.00d140Tue 3/31/15Tue 3/31/15
158 29.1  -  Install Grills & Registers for Paint1.00d131Tue 3/31/15Tue 3/31/15
159 29.2  -  Set Outdoor Units1.00d165Tue 3/31/15Tue 3/31/15
160 30Plumbing Trim5.00d.Thu 4/2/15Wed 4/8/15
161 30.1  -  Set Fixtures4.00d135,136,146,154Thu 4/2/15Tue 4/7/15
162 30.2  -  Connect Appliances1.00d161Wed 4/8/15Wed 4/8/15
163 31County Final Plumbing Inspection0.00d160Wed 4/8/15Wed 4/8/15
164 32Exterior Landscaping32.00d.Mon 1/12/15Tue 2/24/15
165 32.1  -  Rough Final Grade1.00d119Mon 1/12/15Mon 1/12/15
166 32.2  -  Patios7.00d165,119Tue 1/13/15Wed 1/21/15
167 32.3  -  Porches5.00d166,119Thu 1/22/15Wed 1/28/15
168 32.4  -  Sidewalks7.00d167,119Thu 1/29/15Fri 2/6/15
169 32.5  -  Decks7.00d168,119Mon 2/9/15Tue 2/17/15
170 32.6  -  Driveways2.00d165,169Wed 2/18/15Thu 2/19/15
171 32.7  -  Final Grade and Seed3.00d170,166,167,168Fri 2/20/15Tue 2/24/15
172 33Electrical Final Trim160.00d. Tue 6/5/14 Wed 1/14/15
173 33.1  -  Switch & Plug2.00d142,100 Tue 1/13/15 Wed 1/14/15
174 33.2  -  Install Fixtures1.00d 146 Thu 3/27/15 Thu 3/27/15
175 33.3  -  Connect Appliances1.00d 155,162 Thu 4/9/15 Thu 4/10/15
176 34Hardware12.00d.Fri 3/27/15Mon 4/13/15
177 34.1  -  Door Hardware2.00d145,146Fri 3/27/15Mon 3/30/15
178 34.2  -  Bath Hardware2.00d145,146Fri 3/27/15Mon 3/30/15
179 34.3  -  Mirrors5.00d178Tue 3/31/15Mon 4/6/15
180 34.4  -  Shower Doors10.00d178Tue 3/31/15Mon 4/13/15
181 35Draw #8 (Prime paint, cabinets, doors)0.00d142,152,154Tue 2/17/15Tue 2/17/15
182 36Draw #9 (Trim, furnace, hrdwd, tile, rails)0.00d153,181Tue 2/17/15Tue 2/17/15
183 37Draw #10 (Plumbing & elec. trim, final paint)0.00d146,182Thu 3/26/15Thu 3/26/15
184 38Final Building Inspection0.00d183Thu 3/26/15Thu 3/26/15
185 39Use & Occupancy Certificate0.00d184FS+3dTue 3/31/15Tue 3/31/15
186 40First Walk-thru0.00d185Tue 3/31/15Tue 3/31/15
187 41Draw #11 (Final payment per contract)0.00d186Tue 3/31/15Tue 3/31/15
188 42Final Punch-out9.00d.Wed 4/1/15Mon 4/13/15
189 42.1  -  Punch Out Walk-thru List4.00d186Wed 4/1/15Mon 4/6/15
190 42.2  -  Trim and Adjust Doors2.00d184,189Tue 4/7/15Wed 4/8/15
191 42.3  -  Paint Touch-up3.00d190Thu 4/9/15Mon 4/13/15
192 43Cleaning14.00d.Fri 3/27/15Wed 4/15/15
193 43.1  -  Windows3.00d145,146Fri 3/27/15Tue 3/31/15
194 43.2  -  Rough Clean3.00d193Wed 4/1/15Fri 4/3/15
195 43.3  -  Final Clean2.00d176,188Tue 4/14/15Wed 4/15/15
196 44Final Walk-through0.00d187,188,192Wed 4/15/15Wed 4/15/15
197 45Move-in0.00d196FS+1dThu 4/16/15Thu 4/16/15

[ download sample files or purchase the template ]

Hello Kitty House

[ cad software ]     [ help us help you ]

[ top of page ]












Copyright © 1998 - 2018 by B4UBUILD.COM Site Design by gs design, inc.

  • Skip to main content
  • Skip to primary sidebar

A Step-by-Step Guide to the Home Building Process

building-a-home

Building your new home is exciting, especially when you understand how the process works. It’s understandable that buyers are excited to see their new home built from start to finish says Chip Perschino, senior vice president of construction at Edward Andrew Homes.

“Our homeowners enjoy watching the home come together, from pouring the foundation to framing and watching the home take shape,” he says. “Once the home has drywall, they start to visualize themselves living in the space and how they’ll use it — imagining what furniture goes where and how they’ll entertain friends and family there.

“They spend a good bit of time designing the home to be unique to their family needs and tastes so seeing it all come together is rewarding for them,” Perschino says.

To help you prepare for and understand your new home’s construction, this article outlines the typical steps your builder takes during the construction of a new home and what happens at these key stages.

Keep in mind that the  homebuilding process may vary  from region to region and builder to builder, especially if you’re  building an elaborate custom home . Be sure to ask your builder about their specific policies and procedures.

“We encourage our homebuyers to make an appointment with their agent or project manager to come out and walk through the home at any stage,” Perschino says. “We suggest that it be by appointment to cut down on some of the safety concerns or limitations when a house is under construction. It also gives us a chance to offer a one-on-one conversation that may not be the same via email.”

1. Prepare Construction Site and Pour Foundation

House Foundation

Builder applies for and acquires permits.

Before a builder can put a shovel in the ground, the local government must approve the design and provide permits for everything from the zoning and grading (changing the contour of the land to accommodate your home and driveway) to the septic systems, home construction, electrical work, and plumbing. Once permits are acquired, physical construction can begin.

Construction crew levels site.

Often, site preparation and foundation work are performed by the same crew, but this may not be the case with a wooded lot. Using a backhoe and a bulldozer, the crew clears the home site of rocks, debris and trees and, if applicable, digs for the septic system .

Builder puts up wooden forms for the temporary foundation.

The crew levels the site, puts up wooden forms to serve as a template for the foundation, and digs the holes and trenches

Footings are installed.

Footings serve as the ground support system (usually formed using poured concrete and rebar) to keep the home from sinking. If your home is going to have a well, it will be dug at this point. If the home has a full basement, the hole is dug, the footings are formed and poured, and the foundation walls are formed and poured. If the foundation is slab-on-grade, the footings are dug, formed, and poured; the area between them is leveled and fitted with utility runs (e.g., plumbing drains and electrical chases); and the slab is poured.

Once the concrete is poured into the holes and trenches, it will need time to cure. During this period, there will be no activity on the construction site

Waterproofing and plumbing are installed.

After the concrete is cured, the crew applies a waterproofing membrane to the foundation walls. They also install drains, the sewer system, water taps, and any plumbing that needs to go into the first-floor slab or basement floor. Then they backfill excavated dirt into the hole around the foundation wall.

Cost Breakdown

This first step is the biggest contributor to the cost to build. There are nearly a dozen factors that can influence the cost of your foundation , from climate and soil type to square footage and labor costs. The national average for foundation costs is around $10,000.

Laying the foundation and clearing the way for the house is the most important step, and it can also take a long time to complete. It’s normal to expect this part to take upward of a month.

Inspection #1

When the curing process is complete, a city inspector visits the site to make sure the foundation components are up to code and installed properly. This inspection may be repeated depending on the type of foundation (slab, crawl space, or basement).  Your builder  will then remove the forms and begin coordinating step No. 2, the framing phase.

2. Complete Rough Framing

Wood framing and walls of a home.

Floor system, walls and roof system are completed.

The floor system, walls, and roof system (collectively known as the shell or skeleton of the house) are completed.

Sheathing is applied to exterior walls and covered with protective wrap.

Plywood or oriented strand board sheathing is applied to the exterior walls and roof, and the windows and exterior doors are installed. The sheathing is then covered with a protective barrier known as a house wrap; it prevents water from infiltrating the structure while allowing water vapor to escape. This reduces the likelihood of mold and wood rot.

The average cost to frame a house is currently $7–$16 per square foot, including labor. Costs can vary depending on the complexity and size of the home and availability of materials, so make sure to speak to your contractor to get an accurate estimate.

Framing can take around one to two months, depending on the size and complexity of the home and the weather.

3. Complete Rough Plumbing, Electrical and HVAC

New Home Wiring

During this stage, the following items are installed:

  • Pipes and wires
  • Sewer lines and vents
  • Water supply lines
  • Bathtubs and shower units
  • Ductwork for HVAC system
  • HVAC vent pipes
  • Electrical wiring and receptacles

Once the shell is finished, siding and roofing can be installed. At the same time, the electrical and plumbing contractors start running pipes and wires through the interior walls, ceilings, and floors. Sewer lines and vents, as well as water supply lines for each fixture, are installed. Bathtubs and one-piece shower/tub units are put in place at this point because there’s more room to maneuver large, heavy objects.

Ductwork is installed for the heating, ventilation, and air conditioning (HVAC) system, and possibly the furnace. HVAC vent pipes are installed through the roof, and insulation is installed in the floors, walls, and ceilings.

After the roofing goes on, the house is considered “dried in.” An electrician then installs receptacles for outlets, lights, and switches, and runs wires from the breaker panel to each receptacle. Wiring for telephones, cable TV, and music systems is included in this work.

Note that HVAC ducts and plumbing are usually installed before wiring because it’s easier to run wires around pipes and ducts than vice versa.

Installing rough plumbing in an entire home can cost anywhere from $8,000 to $12,000, or an estimated cost of $4.50 per square foot for new construction.

The national average to wire a new home can be anywhere from $3,269–$6,084 for a 1,000-square-foot house.

Installing an HVAC system with ductwork can cost $7,000 to $16,000, but add-ons can bring this range up to $13,000 to $17,000.

While HVAC may only take three to seven days to install, the rest of the mechanicals, from plumbing to electrical, can take two to four weeks. This step shouldn’t be rushed, because getting stuck in inspections can draw out construction even longer and prevent the project from moving forward.

Inspections #2, #3, and #4

Rough framing, plumbing, and electrical and mechanical systems are inspected for compliance with building codes. Most likely these will be three different inspections. At the very least, the framing inspection will be conducted separately from the electrical/mechanical inspections.

At this stage, drywall (also known as plasterboard, wallboard, or gypsum board) is delivered to the building site.

4. Install Insulation

insulation

Insulation plays a key role in creating a more comfortable and consistent indoor climate while significantly improving a  home’s energy efficiency . One of the most important qualities of insulation is its thermal performance or R-value, which indicates how well the material resists heat transfer. Most homes are insulated in all exterior walls, as well as the attic and any floors that are located above unfinished basements or crawl spaces.

The most common types of insulation used in new homes are fiberglass, cellulose, and foam. Depending on the region and climate, your builder may use mineral wool (otherwise known as rock wool or slag wool), concrete blocks, foam board or rigid foam, insulating concrete forms, spray foam, or structural insulated panels.

Blanket insulation, which comes in batts or rolls, is typical in new home construction. So is loose-fill and blown-in insulation, which is made of fiberglass, cellulose, or mineral wool particles. Another insulation option, liquid foam, can be sprayed, foamed in place, injected, or poured. While it costs more than traditional batt insulation, liquid foam has twice the R-value per inch and can fill the smallest cavities, creating an effective air barrier.

Fiberglass and mineral wool batts and rolls are usually installed in walls, attics, floors, crawl spaces, cathedral ceilings, and basements. Manufacturers often attach a facing such as kraft paper or foil kraft paper to act as a vapor and air barrier. In areas where the insulation will be left exposed, such as basement walls, the batts sometimes have a special flame-resistant facing.

Because of the wide range of insulation types, home sizes, and location climates, the cost of insulation highly varies, ranging from $1.00 to $4.50. The average cost for new home insulation, based on a 2,000-square-foot house, ranges from $2,000 to $10,000; but costs can be as high as $24,000. The good news is that new homes are cheaper to insulate because it’s easier to add when the walls and ceilings are unfinished.

On average, insulating the entire house can take one to two weeks. The type of insulation and the home’s size are important to factor in when looking at your timeline.

5. Complete Drywall and Interior Fixtures; Start Exterior Finishes

Drywall is hung and taped..

Drywall is hung on the interior walls and taped so the seams between the boards aren’t visible, and drywall texturing (if applicable) is completed.

  • The primer coat of paint is applied.
  • Exterior finishes are installed.

Contractors begin installing exterior finishes such as brick, stucco, stone, and siding.

The average cost for drywall is $1.50 to $4.00 per square foot, with the cost per panel ranging from $15 to $60, including labor and materials. Once the drywall is up, the walls and ceiling can be textured, which averages from $0.80 to $2.00 per square foot. It’s cheaper to add texture from scratch, than to remove and retexture walls, so new homeowners are in luck.

The final step to bring it all together is applying the primer coat of paint, which varies depending on the finish. The average cost to paint a room is $300 to $1,000, but a large portion of this cost is labor. If you feel up to it, this is a great project to take on to save money. Homeowners can save up to $500 by painting themselves.

Once the framework is up and the walls begin to take form, the house comes together quickly. This step can take anywhere from a few days to several weeks, depending on the size and complexity of the home.

6. Finish Interior Trim; Install Exterior Walkways and Driveway

Doors, windowsills and decorative trim are installed..

Interior doors, baseboards, door casings, windowsills, moldings, stair balusters, and other decorative trim are installed. 

  • Cabinets, vanities and fireplace mantels are installed.
  • The final coat of paint is applied.

The walls get a final coat of paint or are  wallpapered  where applicable.

In addition, on the exterior, the driveway, walkways, and patios are formed at this stage. Many builders prefer to wait until the end of the project before pouring the driveway because heavy equipment (such as a drywall delivery truck) can damage concrete. But some builders pour the driveway as soon as the foundation is completed so that when homeowners visit the construction site, they won’t get their shoes muddy.

Interior doors average $226 to $824 for installation and materials, including labor. The typical range to install a windowsill is $150 and $700, with full decorative trim averaging around $1,000. All of these aspects can be premade or custom-made, which will influence your costs.

Cabinet costs can vary greatly, depending on the kitchen size, whether they’re custom-made, and what materials are used. The average cost is $7,500, but it can range from as low as $$2,090 up to $40,650 for more elaborate projects.

The average cost per vanity is $100 to $2,600, which includes the sink, faucet, cupboard, and sometimes the mirror and cabinets.

Fireplace mantels are a great way to personalize your home, and the cost for fireplaces, including installation and finishing, ranges from $630-$2,525 if electric, or $3,558 and $14,609 if you opt for gas, masonry, or wood-burning.

At this point, several steps can begin to come together at once. Installing the flooring, trim and driveways and walkways can take around one to two months.

7. Install Hard Surface Flooring and Countertops; Complete Exterior Grading

Close shot of medium brown wood floor.

  • Ceramic tile, vinyl and wood flooring are installed as well as countertops.
  • The exterior finish grading is completed to ensure proper drainage away from the home and to prepare the yard for landscaping.

The cost to install flooring will depend on the type of floors you choose. Hardwood and tile typically cost more than vinyl or linoleum or carpet, but the average cost is around $3,500 per 500-square-foot space.

Similar to flooring, the type of countertops you choose will greatly affect the cost. On average, installing countertops in a new home costs around $1,565 to $3,560, including labor.

Exterior finish grading ranges from around $1,400 to $3,700 depending on labor costs, materials available, and how much yard grading and filling is necessary.

Timeline: The flooring and countertops can be added as the trim and cabinetry come together. The exterior grading can take several days, depending on the size of the crew and the weather.

8. Finish Mechanical Trims; Install Bathroom Fixtures

  • Light fixtures, outlets and switches are installed, and the electrical panel is completed.
  • HVAC equipment is installed and registers completed.
  • Sinks, toilets and faucets are put in place.

Lighting installation costs depend on the fixture type — ceiling lights, recessed lights, pendant lights and so on all have different labor costs. The national average for light fixture installation is $553, but costs can range from $155 – $954.

The average cost to install an electrical panel and wiring is about $550 to $3,000, and it’s highly recommended to hire a licensed electrician for the project.

Installing faucets runs around $161 and $364 on average, while sinks cost $330 to $1,300 and toilets around $400 and $800 on average to install. This is important to keep in mind when planning how many bathrooms you want your new house to have.

Once everything is finally looking like a home, installing the finishing touches should only take a few weeks.

9. Install Mirrors and Shower Doors; Finish Flooring and Exterior Landscaping

  • Mirrors, shower doors and carpeting are installed and final cleanup takes place.
  • Trees, shrubs and grass are planted and other exterior landscaping is completed.

Depending on the size of your bathroom and mirror space, the average cost to install a mirror ranges from about $158 – $469. Shower doors average $700, depending on size, type, and installation.

The average cost for landscaping is around $8,150, but depending on the size of your lawn, labor costs, and design complexity, it could range anywhere from $2,600 to $13,700. Hiring landscape designers and crew members increases the cost.

After work is done on the inside of the house, the final cleanup takes around a week, and during this time the exterior landscape can be put together to make the house just as perfect on the outside as it is on the inside.

Inspection #5

A building code official completes a final inspection and issues a certificate of occupancy. If any defects are found during this inspection, a follow-up inspection may be scheduled to ensure that they’ve been corrected. This can sometimes take up to a week.

10. Conduct Final Walk-Through

Your builder will walk you through your new home to acquaint you with its features and the operation of various systems and components and explain your responsibilities for  maintenance and upkeep , as well as warranty coverage and procedures .

This is often referred to as a  pre-settlement walk-through . It’s also an opportunity to spot items that need to be corrected or adjusted, so be attentive and observant. Examine the surfaces of countertops, fixtures, floors, and walls for possible damage.

Sometimes disputes arise because the homeowner discovers a gouge in a countertop after moving in and there’s no way to prove whether it was caused by the builder’s crew or the homeowner’s movers.

The final walk-through can take upward of a week to complete.

A Note on Timelines

The best way to get an accurate timeline on your project is to keep in constant communication with your builder.

A Few Words About Inspections

As you’ve seen, your new home will be inspected periodically during the course of construction. In addition to mandated inspections for code compliance, your builder may conduct quality checks at critical points in the process. The idea is to catch as many potential problems as possible before construction is finished, though some issues may not surface until you’ve lived in the home for a period of time.

A survey of the New Home Source Insights Panel found that most panelists are interested in tracking the progress of their new homes — whether via email communication from the builder, driving by or even through the use of drones. Before you head to the homesite unannounced, talk to your builder early on about attending inspections, with or without your real estate agent. Even if your presence is not required, it’s an opportunity to learn more about what’s behind the walls of your new home and how everything works. If you’re planning to hire your own inspector to do an additional review of the home, notify your builder prior to the start of construction.

In our  New Home Learning Center , you’ll find helpful and inspiring articles, slideshows, and videos that will make your new home journey easier and more rewarding.

According to the 2019 Survey of Construction by the U.S. Census Bureau, building a family home can take around seven months. A custom home generally takes more time to build, depending on how elaborate the plans are.

There are several factors that go into building costs, such as labor availability, size of the home, material costs, energy efficiency, and location. The U.S. Census Bureau estimates that the national average cost for a new home in 2024 was $400,500.

Building a new home requires a lot of preparation, and having to make changes mid-construction can become costly. Here are a few boxes to check before starting construction: – Choose your location or lot. Not all land is suitable to build on, so make sure it meets all regional codes and zoning laws and fits with your lifestyle. – Before you can start construction, you need to make sure that your budget is set and speak with your bank about the best loan for your situation. – Unless you’re taking on this monumental project on your own, you’ll need to hire a trustworthy team. Do some research to find your builder; they’ll help you assemble the rest of the team. – Put the finishing touches on your house plan. The internet is full of great resources to get you started , and you can consult professionals to make sure it’s all feasible.

Every builder is different, but most will call you when any big issues or decisions come up. It’s a good idea to call or email your builder whenever you want to check on the status or have any questions.

You can find and buy land on your own, but it’s a lot easier to let your builder look for a lot. Not only will your builder have experience in buying lots, but they understand the process and know how to save you time and money. 

No, unless you’re acting as the contractor on your project, the builder will provide a dumpster and portable toilet for contractors. If you have any questions about where those items will be located or cost factors, ask your builder. Depending on the size, dumpster rental prices range from $300 to $600 a week.

– Weather is a major factor that can affect the construction timeline. Builders can’t work in dangerous conditions, and they don’t want to put the construction materials or workers at risk. Depending on where you live, you can plan to build during a milder season, as long as your contractor is available. – Availability of materials doesn’t just affect the budget; if there are shortages it can delay construction and extend your timeline. – Availability of contractors determines when you can start your project. Although it could take time to find the perfect contractor for your project, it’ll pay off to wait for the right builder. – Inspections are an essential part of the homebuilding process, and often your builder can’t move to the next step without an inspection. Having a clear timeline, open communication with your builder, and planning ahead for inspections can help you stay on track, but some delays may be inevitable.

Other than smaller aesthetic projects, like gardening or painting, the answer is probably no, leave it to the professionals. Projects that you could take on later, depending on your level of DIY experience, include: – Patios — Your outside space has major potential , from outdoor kitchens and decks to firepits and pools, but some smaller patio projects may be feasible for you to take on yourself. – Gardening — Planning and planting your garden doesn’t have to be left to the professionals. There are plenty of resources to help get you started or to give your green thumb inspiration . – Painting — It takes more effort to paint the entire house than to paint one or two rooms, but this is a great step to take on yourself to save money. – Flooring — If you decide to switch up your flooring from what was originally put down, installing your own flooring can be a great way to save money that would’ve gone to hiring someone else.

Beyond visiting your home site for specific walk-throughs , it’s up to you and your builder to determine how often you should visit. Keep in mind that all visits should be booked in advance with the construction manager and that all safety protocols must be followed.

A row of new homes with well-maintained lawns.

Reader Interactions

February 5, 2020 at 12:01 pm

I didn’t see a mention of when windows we’re to be installed? Before or after Sheetrock? Before or after HVAC?

March 10, 2020 at 10:16 pm

It’s under step #2

September 14, 2023 at 1:59 pm

I am having a home built on my land, no loan, cash draws. Is builder required to give me keys so I can monitor construction?

July 23, 2023 at 10:39 am

Absolutely great info. Thank you

Cassandra Massenburg

June 16, 2020 at 3:00 pm

Do you have a video of the home building process

Jamie Garcia

June 19, 2020 at 3:21 pm

Hi Cassandra, Here you go! https://www.youtube.com/watch?v=LrUQZPFGE-k

Raul Flores

September 15, 2020 at 3:05 pm

Linda J Pavlos

July 18, 2020 at 8:08 pm

At what stage is the roofing finished? The beginning or the end?

July 28, 2020 at 2:51 pm

Hi Linda, As the article states, roof systems are completed very near the beginning of the process. You can ask your builder for a timeline specific to your home.

Tamika McGee

September 28, 2020 at 7:51 pm

Will I need the same inspections and permits to build a 2 story Bungalow tiny home on my own land as I would a regular home?

October 6, 2020 at 5:14 pm

Hi Tamika, You can read about the legalities surrounding tiny homes here: https://www.newhomesource.com/learn/tiny-house-legal/ and for more info on tiny homes, check out our tiny homes resource center: https://www.newhomesource.com/learn/tiny-houses/

drakesatterwhite

November 22, 2020 at 5:25 pm

after the foundation is finished which room is the best to start at?

December 2, 2020 at 1:08 pm

Hi, You will need to discuss all building plans with your builder.

jose manuel Velasquez

February 18, 2021 at 1:43 am

Can I use different contractors for each step or does it have to be one specific builder?

March 12, 2021 at 1:05 pm

Hi Jose, If you choose to build your home on your own, you can certainly select your own, hand-picked team of contractors. However, if you choose to use an established builder, you agree to use that builder’s preferred contractors. You can always have a conversation with your builder regarding this (if, say, you have one particular contractor you want to use but are OK with using the builder’s contractors for the rest), but that is between you and the builder.

Thane roedel

February 7, 2021 at 8:40 pm

It looks like there are 4 inspections, is there a point in the progress say after stage 4 or 5 that I can finish the house on my own to save money.?

March 12, 2021 at 1:03 pm

Hi Thane, This may be possible, but you aren’t likely to find a builder who will agree to this.

August 27, 2021 at 10:37 pm

How long it will take to construct a new house from step 6? Just approximate timeline from step 6 to finish

August 30, 2021 at 3:05 pm

Hello, It varies from builder to builder. The best thing to do is stay in contact with your builder throughout the process to get updated timelines.

Dillon Wood

September 7, 2022 at 10:05 am

Who wrote this web page? I am looking to cite this for a project. Thanks.

September 23, 2022 at 11:10 am

Hi Dillon, The author is Jenna Royall.

June 2, 2023 at 1:38 pm

If I built my own house myself, as in I am doing everything my self without a builder, what would be different?

June 8, 2023 at 9:09 am

Building your dream home can be an exciting journey. This step-by-step guide provides invaluable insights, from planning and design to construction and finishing touches, ensuring a smooth and successful home building experience.

July 21, 2023 at 9:46 pm

I need a new house it needs to be blue

Mary Louise

July 28, 2023 at 10:45 am

Hello – This is a very informative series of articles. Any chance we could get an update on 2023 pricing? Also, in addition to the cost of the average newly-constructed house, could you provide the square footage? thank you

September 22, 2023 at 7:21 pm

I’d say new construction today would be $175 to $300 per sq Ft depending on location and complexity. But get multiple quotes.

We’re having a 4300 sq ft home built and we got quotes ranging from high 600s all the way to $1.2 million. Different builders quoting the same home plans.

September 30, 2023 at 7:23 am

Great work guys, Thanks for all the information. Me and my sister are planning to build a house in Myrtle Beach SC ( inland area) We will let you know about the experience. Thank you

Earline Fitzgerald

August 11, 2023 at 10:34 am

I’m not building a home but I’m writing a novel where the integral characters are the designer, architect, & construction company. I’d done a lot of research on jobs & responsibilities, different types of insulation, stick vs steel, solar, in floor heating, skylights, smart homes, costs, etc. But I realized I didn’t know all the steps from building through completion and this site gives it to me. T Thank you.

September 7, 2023 at 6:29 am

When does the septic tank and field get dug / constructed?

September 22, 2023 at 7:18 pm

Ours got installed just before the insulation and drywall.

September 22, 2023 at 8:40 pm

Hi, for what state is this? I am in Houston, Texas. Are these supposed to be same steps?

Thomas E Beck

October 8, 2023 at 1:18 pm

We bought our existing 1973 view home N of Seattle on Whidbey Island in 2003. We rebuild bathroom and completed downstairs room. We replaced all interior doors with custom doors. Installed 2,700 ft2 of tile, hardwood and synthetic floor ourselves. Completed board and batton on entire exterior. Rebuilt 3 large decks. Repainted intire interior, etc. etc. So for our new second 1,400 ft2 home we can do a lot of the work ourselves. We are using SIPs. Originally we had a 2,800 ft2 2nd home designed until we realized it could easily cost a million dollars. That is obscene. Your step by step process will not require most of the framing and insulation steps. I watched the county build a stick frame new fire station and it not only took forever to complete but seems archaic design wise. SIPs and so much easier and faster.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Create and Furnish a Tiny House: Exploring Perimeter and Area Project-Based Learning Unit

Create and Furnish a Tiny House: Exploring Perimeter and Area Project-Based Learning Unit

Included with a Premium Membership Subscribe for instant access to this and every resource on TeacherVision.

Add to Folder
creative writing
children's book
activities
classroom tools
language arts and writing
vocabulary

Students Design a Floorplan for a Tiny House Using Area and Perimeter

Learn about tiny houses, think like an architect to design the perfect floor plan, use measurement and conversion skills to design furniture to scale, use formulas to compute area and perimeter, and synthesize that knowledge by designing and creating a professional floor plan for a tiny house!

Your students will think like architects and builders in this project-based learning unit for grades 5-7 math. They'll learn all about tiny houses, use measurement and conversion formulas to compute area and perimeter, plan and problem-solve for tricky layout and building issues, and then design and create a professional floor plan for a tiny house, including scaled furniture.

What's Inside

Packed with hands-on inquiry-based activities, extensions and enhancements, cross-curricular independent and group work, and engaging and interactive challenges, this 48-page project-based unit comes complete with:

  • For the Teacher: A complete Perimeter and Area Lesson Plan with step-by-step instructions for all activities, teaching tips, assessment guidance, and inquiry questions.
  • For Students: A full-color Student Pack complete with all of the printables, slides, photos, and instructions students need for the research, experiments and activities - just print (or share) and teach!

A complete, ready-to-teach Teacher Pack that includes:

  • Teacher versions of all the student printables with step-by-step annotations and notes for teaching perimeter and area, scale measurements, and floorplan layout;
  • Formative and summative assessments, answer keys, and a full project rubric;
  • Instructions and guidance for the extension activities and project enhancements;
  • Materials and resources lists, links to articles, videos, and research, plus additional resources for lecture and presentation.

What's Included

Lesson Plan - Step-by-Step Project Guide

  • Milestone 1: Tiny House Planning
  • Milestone 2: Creating a Floor Plan
  • Milestone 3: Creating Furniture to Scale
  • Milestone 4: Finding Perimeter and Area
  • Milestone 5: Creating a Professional Floor Plan 

Teacher and Student Resources

  • Materials List for the Projects in this Unit
  • Books About Perimeter, Area, and Tiny Houses (optional)
  • Tour of a Tiny House Video Activity Reflection Prompt
  • Tiny House Project Overview and Instructions
  • Patterns in Geometry Activity and Answer Key
  • Planning a Tiny House Floorplan Design Activity
  • Milestone #1 Inquiry Question Writing Prompt
  • Floorplan Sketch Requirements Handout
  • Milestone #2 Inquiry Question Writing Prompt
  • Sample Tiny House Floorplan Handout
  • Living in a Tiny House Reflective Writing Activity
  • Converting Lengths Activity and Answer Key
  • Milestone #3 Inquiry Question Writing Prompt
  • Perimeter and Area Quick Quiz and Answer Key
  • Measuring Furnishings to Scale Handout
  • Tiny House Challenge Activity and Answer Key
  • Perimeter and Area of a Tiny House Calculation Sheet
  • Milestone #4 Inquiry Question Writing Prompt
  • Choosing a Tiny House Activity
  • Professional Floorplan Requirements Handout
  • Milestone #5 Inquiry Question Writing Prompt
  • Perimeter and Area Summative Assessment and Answer Key
  • Perimeter and Area Project Rubric 

Lesson Plan - Exploring Perimeter and Area Project-Based Learning Lesson

  • Project Overview

This project-based learning lesson is designed to support and reinforce the concepts taught as part of a math lesson or unit on perimeter and area, measurement and conversion, and scale. It is built around 5 inquiry-based milestones that incorporate cross-curricular hands-on projects, formative and summative assessments, independent and group activities, and extensions.

STUDENT/GROUP OUTPUT:

In the course of this project-based learning unit, students will:

  • Build background knowledge about tiny houses by researching and studying them in detail;
  • Explore the house design and building process by learning about floor plans and modeling measurements to scale;
  • Use specific formulas to compute area and perimeter for their house designs;
  • Learn how to apply measurement and conversion skills to design properly-scaled furnishings;
  • "Show what they know" by designing and creating a professional floorplan for a tiny house and scale furniture.

SUGGESTED SUBJECT PREREQUISITES:

Students will acquire necessary background knowledge of area and perimeter and measurement and conversion as part of this project, and instructional materials for providing that background are included in the Teacher Pack. 

SEQUENCE AND PACING

This project-based unit is divided into 5 milestones. The minimum suggested duration for completing this project-based unit is 5 class periods. However, the unit is completely flexible can be lengthened or shortened as necessary or desired, based on available class time and interest level.

TECHNOLOGY RESOURCES (suggested):

  • Internet access

STANDARDS ALIGNMENT

These activities support the following CCSS curriculum standards:

  • CCSS. Math.Content.6.G.A1: Solve real-world and mathematical problems involving area, surface area, and volume
  • CCSS.Math.Content.7.A1 & A2: Draw construct, and describe geometrical figures and describe the relationships between them
  • CCSS.Math.Content.7.G.B6: Solve real-life and mathematical problems involving angle measure, area, surface area, and volume

Featured Middle School Resources

Elements of Poetry Workbook

Related Resources

Teacher teaching Math

Saint Petersburg, FL

Tyrone Boulevard

  • 3334 Tyrone Boulevard

3334 Tyrone Blvd Saint Petersburg, FL 33710 / 2340

Information about property on 3334 Tyrone Blvd, Saint Petersburg FL, 33710-2340. Find out owner contacts, building history, price, neighborhood at Homemetry Address Directory.

Property Details

Householders and tenants for 3334 tyrone blvd, saint petersburg fl, possible residents.

Person Name Phone Number Additional Info
MAC Pools & Spas
Organization Phone Number Additional Info
Charles Keesock
Charles Keysock
Ed Kamall
Paintings of The World
Pools by Owner, Inc

Possible Businesses

Organization Phone Number Additional Info
Astro Electronics, Inc
Cellular City, Inc
Master Assembly Corporation of Pinellas, Inc
South Pasadena Building Corp
Vapor Road LLC

Where is 3334 Tyrone Blvd, Saint Petersburg FL located on map?

Tyrone blvd fire incident history, tyrone blvd incidents registered in fema (federal emergency management agency), properties nearby.

Street AddressResidens/Landlords
Jm Quinn Enterprise, Inc, Outdoor Accents of Florida
B & S PERFORMANCE MARINE, INC, Carburetor World, Inc
Lindell Mazda, Pinellas Motorcars LLC
AA3 RANCH INCORPORATED, Florida Floors, Inc
Alan Waterproofing & Coating Co, City Collision, Inc
Commercial Electronic Systems, Commercial Electronics Systems INC
V T. PRINTING, INC, Yoga Etc Studio
Vitality Chiropractic and Wellness Center, Vitality Chiropractic & Wellness Center
Holistic Massage by Courtney, Holistic Touch by Courtney Morgan LMT
All Pro Auto Repair, Delaney Auto Sales, Inc

Houses for Sale on Tyrone Boulevard (6)

Recently Sold Homes on Tyrone Boulevard (13)

Recent rentals on Tyrone Boulevard (12)

Houses for Sale on Saint Petersburg, FL (5000)

Recently Sold Homes on Saint Petersburg, FL (5000)

Houses for Rent on Saint Petersburg, FL (943)

Recent rentals on Saint Petersburg, FL (3522)

Browse homes in Saint Petersburg, FL

Street Address

FAQ about the house at 3334 Tyrone Blvd, Saint Petersburg, FL

  • Have there been any fire incidents near the house at 3334 Tyrone Blvd, Saint Petersburg, FL? The last fire incident at the house at 3334 Tyrone Blvd, Saint Petersburg, FL was in 2019. Other fire incidents of this house are available at the link.
  • Were there any reported FEMA incidents at 3334 Tyrone Blvd, Saint Petersburg, FL? The last FEMA incident recorded at 3334 Tyrone Blvd, Saint Petersburg, FL was in 2010. Other FEMA incidents registered on Tyrone Blvd are available at the link .

What channel is Rangers v Motherwell? TV and live stream details plus team news, referee and VAR

Celtic launch another transfer raid to sign striker as defender closes in on move

  • Environment
  • Rugby Union
  • Other Sport
  • Sport Opinion
  • Film and TV
  • Theatre and Stage
  • Edinburgh Festivals
  • Scran Podcast
  • Advertise My Business
  • Place Announcement
  • Place A Public Notice
  • Advertise A Job

Sick Philippe Clement opens up on Hampden pitch, Danilo situation, exiled duo and his housebuilding joke

Mark Atkinson

It was a bunged-up Philippe Clement who presented himself at the Rangers media table on Friday afternoon. The Belgian has been laid low by the lurgy the past few days, putting paid to his plans to inspect his team's new home on Thursday.

Clement did not look 100 per cent as he fielded questions on Rangers' first match at Hampden Park this season. It's been a busy week for the 50-year-old, with Rangers on Champions League duty in Lublin against Dynamo Kyiv - presumably where Clement picked up his bug. The manager will be present at the national stadium on Saturday, though, for the visit of Motherwell in the Premiership.

Advertisement

Sign up to our Football newsletter

Thank you for signing up.

Did you know with a Digital Subscription to The Scotsman, you can get unlimited access to the website including our premium content, as well as benefiting from fewer ads, loyalty rewards and much more.

The flit five miles away from Ibrox is down to a delay in materials arriving from Asia to complete work on the Copland Stand. The tentative hope is that Rangers may be able to return to Govan by the end of September for their game against Hibs, but the honest truth is that no-one really knows exactly when the stadium will be ready. Clement has not sought assurances from the board on when they'll be back.

Rangers play their first 'home' game against Motherwell on Saturday.

"I don't know if you bought a house or you built a house one time?" Clement joshed with one reporter when asked if he had been in chairman John Bennett's ear for a timescale. "It's different in the UK. There are not so many new houses. That's true. But yeah, it's in the hands of other people. It's not in the hands of the club. So until everything is done perfectly, there are no guarantees in that way. Of course, everybody is pushing to have it as fast as possible. But nobody can give guarantees around that."

Clement's mood may be darker come 5pm on Saturday if Rangers have not taken all three points against Motherwell. Already trailing Celtic by two points after the first round of fixtures after a 0-0 draw with Hearts at Tynecastle, there is little margin for error. Although the Steelmen may resent not being at Ibrox either - they won 2-1 on their last visit there.

Rangers have not made special arrangements for moving to Hampden. Clement and his players have enough experience already of the place. They've won and lost a cup final there under his watch. Asked if Rangers have made a visit this week, the manager responded: "No, I don't think it would make a difference to be there. Our schedule has been really busy. There was no time to do that. Ninety per cent of the squad played several games there. So it's only for the new guys. It's the same with European games when you play somewhere else. It's not a big difference."

Loading....

Some concerns have been raised about the pitch at Hampden. Relaid after a couple of P!nk concerts earlier in the summer, Rangers had to fork out to the Scottish Football Association to make sure it is ready for competitive action. Clement has sent henchmen to take a look at the surface and reports have been positive.

"I'm happy about the pitch," Clement confirmed. "That's really important. The people worked really hard to have a good pitch. That was my idea to go and check it yesterday. But it was not possible because I was sick. But I hear it's really good. That's the main thing for us. There was good cooperation between the two [sets of ground staff]."

Philippe Clement has been struggling with illness.

Now it's about what happens on the pitch for Rangers. Clement has to be careful with his team selection, with some of his squad still not ready for 90 minutes. There is also the prospect of the second leg against Dynamo Kyiv on Tuesday night, back at Hampden, with the third qualifying round delicately poised at 1-1.

Rangers fans want to see more of Danilo, who has been an unused substitute in the past two matches. The Brazilian is only just back from seven months on the sidelines due to knee surgery. Clement explained why he has been so cautious with his return.

"Dani is an exciting player," said Clement. "He was really good when I made my start here. He played a lot of minutes, scored good goals and did the right things. But it's been a very serious injury when you're seven months out. It's a normal thing that you need a little bit more time to get to your best form.

"We will work with him on that. It's getting better and better. And of course, playing minutes, that also depends on the situation in the game. If you're leading the game, it's also easier to give some minutes. Otherwise, we need to see where we get on."

One man Rangers fans won't see is Todd Cantwell. The playmaker told Clement in the close season that he wants to leave and as a result has been jettisoned to the B team. Images emerged on Friday of him training, sparking speculation that he may be back in the first-team picture. Clement put that to bed.

Todd Cantwell still appears to be on his bike.

"I have no idea about that," Clement replied when quizzed if an exit is close for the 26-year-old. "Yes, he's training separately because he said clearly that he wanted to go." Ianis Hagi is another who is reported to be very close to leaving, with some claiming his contract will be ripped up. "Not a rumour that I hear until now," stated Clement. "It's my job to see what's necessary for the squad, what profiles we need. There are other people financially making decisions. So it's about that. It's not me making those kinds of decisions.”

All roads therefore lead to Hampden. "At the moment, I'm training, I'm working, I'm playing games with the players who want to do that here," added Clement. He will hope those selected get the job done in the first 'home' game of the season.

Want to join the conversation? Please register or log in to comment on this article.

Saint Petersburg FL Real Estate & Homes For Sale

1907 Arrowhead Dr NE, Saint Petersburg, FL 33703

IDX information is provided exclusively for personal, non-commercial use, and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Information is deemed reliable but not guaranteed. Some IDX listings have been excluded from this website. Listing Information presented by local MLS brokerage: Zillow, Inc - (407) 904-3511

  • Pinellas County
  • Saint Petersburg

house photo

Saint Petersburg Market Overview

$383,371.71 Average Home Values

4.03% 1-year value change

0.976 Median sale to list ratio

68.3% Percent of sales under list price

Is Saint Petersburg a Buyer's Or Seller's Market?

market temperature chart

Buyer : Sellers outnumber buyers. Listing cuts and concessions are common, but not automatic. Prices are generally flat.

Find a Home You'll Love

Search by bedroom size.

  • 1 Bedroom Homes for Sale in Saint Petersburg FL
  • 2 Bedroom Homes for Sale in Saint Petersburg FL
  • 3 Bedroom Homes for Sale in Saint Petersburg FL
  • 4 Bedroom Homes for Sale in Saint Petersburg FL
  • 5 Bedroom Homes for Sale in Saint Petersburg FL

Homes by Price

  • Homes for Sale Under 100K in Saint Petersburg FL
  • Homes for Sale Under 10K in Saint Petersburg FL
  • Homes for Sale Under 150K in Saint Petersburg FL
  • Homes for Sale Under 200K in Saint Petersburg FL
  • Homes for Sale Under 20K in Saint Petersburg FL
  • Homes for Sale Under 250K in Saint Petersburg FL
  • Homes for Sale Under 300K in Saint Petersburg FL
  • Homes for Sale Under 30K in Saint Petersburg FL
  • Homes for Sale Under 400K in Saint Petersburg FL
  • Homes for Sale Under 50K in Saint Petersburg FL

Choose Homes by Amenity

  • Saint Petersburg Luxury Homes for Sale
  • Saint Petersburg Waterfront Homes for Sale

Select Property Type

  • Saint Petersburg Single Family Homes for Sale
  • Saint Petersburg Condos for Sale
  • Saint Petersburg Bank Owned Homes for Sale
  • Saint Petersburg Short Sales Homes for Sale
  • Saint Petersburg Townhomes for Sale
  • Saint Petersburg Duplexes & Triplexes for Sale
  • Saint Petersburg Land for Sale

Popular Searches in Saint Petersburg FL

  • Newest Saint Petersburg Real Estate Listings
  • Homes for Sale in Saint Petersburg FL with 3D Home Virtual Tours
  • No HOA Homes for Sale in Saint Petersburg FL
  • Homes for Sale in Saint Petersburg FL with Air Conditioning
  • Homes for Sale in Saint Petersburg FL with Basement
  • Homes for Sale in Saint Petersburg FL with Garage
  • Homes for Sale in Saint Petersburg FL with Pool
  • Single Story Homes for Sale in Saint Petersburg FL
  • Saint Petersburg Housing Market
  • Pinellas County FL Zip Codes

Explore Nearby & Average Home Values

Nearby saint petersburg city homes.

  • Saint Petersburg Homes for Sale $383,371
  • Largo Homes for Sale $362,181
  • Seminole Homes for Sale $411,180
  • Pinellas Park Homes for Sale $321,145
  • Ruskin Homes for Sale $349,192
  • Gulfport Homes for Sale $404,369
  • Saint Pete Beach Homes for Sale $716,803
  • Treasure Island Homes for Sale $630,630
  • South Highpoint Homes for Sale $315,862
  • South Pasadena Homes for Sale $361,166
  • Kenneth City Homes for Sale $315,357
  • Madeira Beach Homes for Sale $773,724
  • Harbor Bluffs Homes for Sale $692,633
  • Tierra Verde Homes for Sale $880,995
  • Redington Shores Homes for Sale $795,492
  • North Redington Beach Homes for Sale $787,104
  • Redington Beach Homes for Sale $915,521
  • Indian Shores Homes for Sale $726,281
  • Feather Sound Homes for Sale -
  • Terra Ceia Homes for Sale $819,959

Saint Petersburg Neighborhood Homes

  • Downtown Homes for Sale $817,494
  • Historic Old Northeast Homes for Sale $1,015,972
  • Historic Kenwood Homes for Sale $544,852
  • Euclid-St Pauls Homes for Sale $614,338
  • Historic Uptown Homes for Sale $529,386
  • Bartlett Park Homes for Sale $287,328
  • Thirteenth St Heights Homes for Sale $260,262
  • Albert Whitted Airport Homes for Sale -
  • Melrose Mercy - Pine Acres Homes for Sale $241,101
  • Crescent Heights Homes for Sale $712,726
  • Greater Woodlawn Homes for Sale $606,951
  • Crescent Lake Homes for Sale $773,573
  • Lake Euclid Homes for Sale $363,715
  • Campbell Park Homes for Sale $249,788
  • Woodlawn Oaks Homes for Sale $386,270
  • Methodist Town Homes for Sale -
  • Historic Roser Park Homes for Sale $529,405
  • Old Bayside and Marina Homes for Sale -
  • James Clearview Homes for Sale -
  • Graham-Rogall Homes for Sale -

Saint Petersburg Homes by Zip Code

  • 33710 Homes for Sale $400,813
  • 33713 Homes for Sale $379,490
  • 33702 Homes for Sale $351,988
  • 33705 Homes for Sale $361,509
  • 33781 Homes for Sale $324,764
  • 33703 Homes for Sale $448,856
  • 33707 Homes for Sale $414,678
  • 33782 Homes for Sale $316,725
  • 33709 Homes for Sale $296,022
  • 33712 Homes for Sale $338,121
  • 33714 Homes for Sale $289,269
  • 33711 Homes for Sale $308,844
  • 33701 Homes for Sale $712,396
  • 33704 Homes for Sale $767,005
  • 33716 Homes for Sale $201,142
  • 33706 Homes for Sale $685,493
  • 33762 Homes for Sale $344,163
  • 33744 Homes for Sale -
  • 33730 Homes for Sale -

Estimate Your Home Sale Proceeds

  • Home Sale Calculator

Have You Considered Renting?

  • Saint Petersburg Apartments for Rent
  • Saint Petersburg Luxury Apartments for Rent
  • Saint Petersburg Townhomes for Rent

Disclaimer: School attendance zone boundaries are supplied by Pitney Bowes and are subject to change. Check with the applicable school district prior to making a decision based on these boundaries.

About the ratings: GreatSchools ratings are based on a comparison of test results for all schools in the state. It is designed to be a starting point to help parents make baseline comparisons, not the only factor in selecting the right school for your family. Learn more

  • Home and Garden
  • Wisconsin Family
  • Green Sheet
  • Be Wisconsin
  • Home & Garden Ideas

What is the oldest building in Wisconsin?

It's been nearly 180 years since Wisconsin became a state, but European settlers have made homes here since the 1600s.

Though many of the structures inhabited by these first Wisconsinites have been lost to time, a handful of buildings from the pre-statehood era are still around. However, the answer to the question, "What's Wisconsin's oldest building?" is somewhat complicated. (Hint: It depends if you count buildings constructed elsewhere and then transported to Wisconsin).

Here's what to know.

The oldest building constructed in and still standing in Wisconsin is believed to be Green Bay's Tank Cottage, now located at 2640 S. Webster Ave. inside the Heritage Hill State Historical Park .

Tank Cottage is thought to have been built sometime between 1776 and 1803 on the west bank of the Fox River by Joseph Roi, a French-Canadian fur trader and one of Green Bay's first settlers. In 1805, it was sold to Jacques Porlier, another fur trader who was appointed Captain of the Militia by the British Government during the War of 1812. The cottage became a local headquarters for the British during the war. But, according to the cottage's nomination form for its listing on the National Register of Historic Places, Porlier swore allegiance to the United States following the war and "was forgiven for his British allegiances." Porlier then served as chief justice of Brown County until 1836.

In 1850, Niels Otto Tank, a wealthy Norwegian missionary hoping to establish a Moravian colony, obtained the cottage after purchasing several hundred acres of land along the Fox River. After Tank died in 1864, his widow lived there until her death in 1891.

In 1908, Tank Cottage was moved to Tank Park , a park given to the city by Mrs. Tank, according to the nomination form. The cottage was added to the National Register of Historic Places in 1970. In 1976, it was moved again to Heritage Hill, where it's settled among other authentic historical buildings and recreations representing Wisconsin's early history.

You can visit Tank Cottage at Heritage Hill year-round. The park is open from 9 a.m. to 4 p.m. Tuesday through Saturday and noon to 4 p.m. on Sunday in the summer. Between November and April, it's open from 10 a.m. to 4 p.m. Tuesday through Saturday.

Is Marquette's Joan of Arc Chapel the oldest building in Wisconsin?

If you want to get technical, Wisconsin's actual oldest building might be here in Milwaukee. However, it wasn't built in the state ― or even in this hemisphere.

The St. Joan of Arc Chapel on Marquette University's campus was constructed around 1420 in Rhône River Valley in southeastern France. It is believed that Joan of Arc, the 15th-century Catholic saint and teenage heroine of the Hundred Years' War, may have visited and prayed at the chapel in 1429 after meeting with King Charles VII of France. At that time, the chapel was dedicated to St. Martin de Sayssuel.

Today, the mysterious "Joan Stone" sits at the base of an opening behind the chapel's altar. According to Marquette, legends say St. Joan prayed to the Virgin Mary while standing on this stone. After finishing her prayer, St. Joan knelt down and kissed the stone. Ever since, the stone has remained colder than those around it ― a tale chapel tour guides still point out to visitors.

Following the French Revolution in the late 18th century, the chapel fell into ruin . In 1920, it was rediscovered by Jacques Couëlle, a young architect. "When Gertrude Hill Gavin — daughter of an American railroad magnate and a devotee of St. Joan of Arc — learned of the chapel, she acquired it and had it dismantled and shipped to her property on Long Island," Marquette's website explains. The chapel arrived in New York in 1926 or 1927.

In 1962, Gavin sold the chapel to Marc Rojtman, a wealthy art patron and philanthropist, who donated it to Marquette. The chapel was dismantled, brought to Milwaukee on semi-trucks and reconstructed in time to open on campus in 1966. It remains in use for events, tours and Catholic Mass multiple times weekly. More information and Mass schedules can be found online .

What is the oldest building built in Milwaukee?

The oldest building constructed in Milwaukee was also moved from its original location. The  Kilbourntown House , now located in Estabrook Park, was completed in 1844 (about three years before Old St. Mary's Catholic Church , another of Milwaukee's oldest buildings).

Also known as the Benjamin Church House, the Kilbourntown House was built in early Milwaukee's Kilbourntown settlement on the west side of the Milwaukee River by New York carpenter Benjamin Church for himself, his wife and their six children.

In 1938, the house was saved from destruction, moved to the park and restored by the Works Progress Administration. Today, it still contains a collection of mid-19th-century furniture and decorative arts. It was added to the National Register of Historic Places in 1972.

According to the Milwaukee County Historical Society , Kilbourntown House is open for tours June through September on Sunday from 10 a.m. to 2 p.m.

More: These 10 historic churches are the oldest still standing in Milwaukee

More: With the new Black Nite dedication, here are the Wisconsin historical landmarks in Milwaukee County

  • Homes for sale
  • Foreclosures homes
  • New construction for sale
  • All new construction
  • New home construction
  • Housing market
  • Recently sold homes
  • Property records
  • Home buying checklist
  • Home buyers reveal: 'What I wish I had known before buying my first home'
  • First-time home buyer resource center
  • More home buying insights
  • Success stories
  • Seller's marketplace
  • See what your home is worth
  • Learn how to sell your home
  • How to select an agent
  • Compare agents & pick the right one
  • Selling your home? Don't neglect these 6 maintenance tasks - or else
  • More home selling insights
  • Apartments for rent
  • Contacted rentals
  • Landlord tools
  • Manage rentals
  • List your rentals
  • Screen tenants
  • Create a lease
  • Collect rent online
  • Renters resource center
  • Should I rent or buy?
  • Debunked! 8 myths about renting you should stop believing immediately
  • Rental report
  • More renting insights

Get pre-approved

  • Mortgage rates
  • Home equity financing rates
  • Refinance rates
  • Finance advice
  • For veterans
  • Mortgage calculator
  • Refinance calculator
  • How much house can I afford
  • Rent vs. buy
  • 6 ways home buyers mess up getting a mortgage
  • Mortgage guide
  • Learn about home insurance
  • More finance insights
  • Search for real estate agent
  • 6 reasons you should never buy or sell a home without an agent
  • Difference between agent, broker & Realtor ®
  • Listing vs. buyer agent
  • How to find a REALTOR ®
  • Real estate agents reveal the toughest home buyers they've ever met
  • More news around REALTORS ®
  • The latest news
  • Housing trends
  • Real estate news
  • Celebrity real estate
  • Unique homes
  • Corporate blog
  • Home improvement
  • 2024 housing market predictions
  • 2023 hottest zip codes
  • Complete guide on how to sell your home
  • Veterans home buyer guide
  • USDA home loan guide
  • Home insurance guide
  • Real estate videos
  • Housing resources

St. Petersburg, FL real estate & homes for sale

111 Tennessee Ave NE, Saint Petersburg, FL 33702

  • 1,056 sqft 1,056 square feet
  • 9,714 sqft lot 9,714 square foot lot

2642 24th Ave N, Saint Petersburg, FL 33713

  • 1,152 sqft 1,152 square feet
  • 5,449 sqft lot 5,449 square foot lot

6978 46th Ave N Lot 209, Saint Petersburg, FL 33709

  • 1,512 sqft 1,512 square feet
  • 1,823 sqft 1,823 square feet
  • 8,475 sqft lot 8,475 square foot lot
  • 1,177 sqft 1,177 square feet
  • 6,852 sqft lot 6,852 square foot lot
  • 1,330 sqft 1,330 square feet
  • 8,612 sqft lot 8,612 square foot lot

Facts about St. Petersburg, FL

Schools in st. petersburg, fl.

  • Bay Vista Fundamental Elementary School
  • View homes for sale
  • Pasadena Fundamental Elementary School
  • Shore Acres Elementary School

Home values for neighborhoods near St. Petersburg, FL

  • Downtown St. Petersburg Homes for Sale $1,175,000
  • Coquina Key Homes for Sale $389,500
  • Historic Old Northeast Homes for Sale $1,350,000
  • Bartlett Park Homes for Sale $422,950
  • Historic Kenwood Homes for Sale $731,812
  • Lake Maggiore Shores Homes for Sale $415,000
  • Palmetto Park Homes for Sale $649,500
  • North Kenwood Homes for Sale $474,000
  • Old Southeast Homes for Sale $917,000
  • Grand Central District Homes for Sale $924,000
  • Lakewood Terrace Homes for Sale $405,000
  • Euclid Place - St. Paul Homes for Sale $875,000
  • Harbordale Homes for Sale $347,250

Home values for cities near St. Petersburg, FL

  • Clearwater Homes for Sale $381,750
  • Largo Homes for Sale $398,950
  • Palmetto Homes for Sale $429,000
  • Apollo Beach Homes for Sale $515,000
  • Ruskin Homes for Sale $374,950
  • St Petersburg Beach Homes for Sale $799,000
  • Pass A Grille Homes for Sale $799,000
  • Pass A Grille Beach Homes for Sale $799,000
  • Rocky Point Homes for Sale $420,000
  • Seminole Homes for Sale $415,000
  • Pinellas Park Homes for Sale $338,500
  • West Lealman Homes for Sale $245,000
  • St. Pete Beach Homes for Sale $760,000
  • Treasure Island Homes for Sale $800,000
  • Lealman Homes for Sale $299,900
  • Gulfport Homes for Sale $439,950
  • Madeira Beach Homes for Sale $895,000
  • Safety Harbor Homes for Sale $679,000
  • South Pasadena Homes for Sale $380,000
  • Anna Maria Homes for Sale $2,900,000

Home values for counties near St. Petersburg, FL

  • Hendry Homes for Sale $335,450
  • Indian River Homes for Sale $439,240
  • Clay Homes for Sale $378,000
  • Flagler Homes for Sale $420,000
  • Bradford Homes for Sale $325,000
  • Gilchrist Homes for Sale $343,000
  • Highlands Homes for Sale $299,900
  • Glades Homes for Sale $349,950
  • Citrus Homes for Sale $317,875
  • Lake Homes for Sale $416,990
  • Brevard Homes for Sale $389,900
  • Alachua Homes for Sale $350,000
  • Hillsborough Homes for Sale $434,900
  • Collier Homes for Sale $760,000
  • DeSoto Homes for Sale $319,000
  • Charlotte Homes for Sale $399,000
  • Hernando Homes for Sale $355,000
  • Hardee Homes for Sale $399,900
  • Lafayette Homes for Sale $429,000
  • Dixie Homes for Sale $387,000

Home values for zips near St. Petersburg, FL

  • 33706 Homes for Sale $799,000
  • 33708 Homes for Sale $699,000
  • 33707 Homes for Sale $425,000
  • 33709 Homes for Sale $259,950
  • 33703 Homes for Sale $499,900
  • 33702 Homes for Sale $378,100
  • 33715 Homes for Sale $545,000
  • 33705 Homes for Sale $450,000
  • 33701 Homes for Sale $995,000
  • 33711 Homes for Sale $359,000
  • 33713 Homes for Sale $455,000
  • 33710 Homes for Sale $409,000
  • 33714 Homes for Sale $298,450
  • 33777 Homes for Sale $352,450
  • 33616 Homes for Sale $484,000
  • 33704 Homes for Sale $1,249,900
  • 33782 Homes for Sale $327,500
  • 33760 Homes for Sale $264,000
  • 33781 Homes for Sale $338,000
  • 33712 Homes for Sale $437,000

How to buy a home in St. Petersburg, FL

Be prepared to buy, moving cost calculator, top real estate markets in florida.

  • Orlando homes for sale
  • Tampa homes for sale
  • Jacksonville homes for sale
  • Sarasota homes for sale
  • Ocala homes for sale
  • Miami homes for sale
  • The Villages homes for sale
  • Pensacola homes for sale
  • Naples homes for sale
  • Cape Coral homes for sale
  • Port St. Lucie homes for sale
  • Lakeland homes for sale
  • Tallahassee homes for sale
  • Destin homes for sale
  • Fort Myers homes for sale
  • Boca Raton homes for sale
  • Clearwater homes for sale
  • Fort Lauderdale homes for sale
  • St. Augustine homes for sale
  • Bradenton homes for sale

COMMENTS

  1. PDF BUILD YOUR DREAM HOUSE (LEVEL 2)

    Build Your Dream Home prior to starting this project to get an introduction to scaling models. Introduction: we are going to learn how to create a model of our dream house and practice some math! First, let's learn about some shapes that we can use to build our house. Show the learner these shapes and ask her or him to identify them.

  2. PDF Build Your Dream House (All Ages)

    Introduction: we are going to learn how to create a model of our dream house and practice some math! First, let's learn about some shapes that we can use to build our house. Option 1: the learner will complete the Beauty in Shapes project before starting Build Your Dream Home to get a more detailed introduction to 2-dimensional shapes OR

  3. PDF Using Area and Perimeter to Design a Fun House

    To get ready for this special assignment, you and your partner must be sure that you have the skills that you, the architects, will need. A solid understanding of area and perimeter is required. Once you show mastery through graph paper drawings, you will design and draw the floor plan for a small house. Then you will determine how much

  4. House Building Assignment Complete with all Resources

    I have also provided a schedule outline, checklist for students for presenting, tips for the project, a detailed and measurable rubric for the teacher to grade on, example areas of rooms to guide their design, an area calculation page, a mortgage application (and a mortgage calculator to help with calculations), and a blank page you can print ...

  5. Build A Tiny House! Project Based Learning for Geometry and Math

    FOURTH: Spec Home 1. Record the area, perimeter, and geometric shape of each item from the requirement list. FIFTH: Spec Home 2. Record the area and perimeter of the major sections of the house (base, walls, roof/ceiling). SIXTH: Build the House. Cut out each of the four sections of the house and fit them together.

  6. House Building Assignment by Fun Math Sheets

    CCSS 7.G.A.1. Solve problems involving scale drawings of geometric figures, including computing actual lengths and areas from a scale drawing and reproducing a scale drawing at a different scale. CCSS 7.G.B.6. Solve real-world and mathematical problems involving area, volume and surface area of two- and three-dimensional objects composed of ...

  7. PDF STEM Stories: If I Built a House Lesson Plan

    build a second houseIntroduction: 5 minutes Slide 22: Show the students the book, If I Built a House, and ask them to raise their hands. nd offer a one-sentence summary of the book. Invite a. many one-sentence summaries as time allows. Alternatively, ask the students to turn to a partner.

  8. PDF INTRODUCTION

    ior drywallsAfter insulation, the interior drywalls can be fited on. o the frame. This seals the insulation in and makes it start to look more. like a home. At the same time, builders will install exterior finishes, such as bric. s. r stucco.6. Final interior touches, xterior workThis stage focuses on interior trim, such as doorframes ...

  9. PDF Build A Tiny House

    The objective of this project is for students to design and build a TINY HOUSE, while applying area, perimeter, and geometry skills. This project based learning activity also focuses on designing elements, using multiple problem solving skills, and collaborating in the classroom. It allows for easy differentiation, so students can work at a ...

  10. How to Build Your Own House: A Step-by-Step Guide

    Prepare the Work Site. Preparing the house site is a collection of activities that must be done before the foundation can be laid. Clearing: Clear the building site of brush and other debris, down to ground level and at least 25 feet around the planned house perimeter. Surveying: Stake out and survey the lot, based on original drawings that ...

  11. The 35 Steps to Building a House: Your Start-to-Finish Guide

    Step 3: Research and hire the building team. Building a home is a huge project, and the average build will involve 22 subcontractors working on the home. The first person you'll need to hire is the general contractor or a custom home builder. They will oversee the construction of your home from start to finish.

  12. PDF Project Scope Statement: Build a House

    Scope Description. The purpose of this project is to build a new house for Mr. and Mrs. Jones. The new house will allow the Jones to have room to raise a family. The Jones will obtain house design drawings/specifications, locate and procure a property for their new home, prepare the site, and identify and select a builder to build the home.

  13. Build a Model Cardboard House : 10 Steps

    Step 3: Measuring Out the Pieces. Once we have the plan of what we want the house to look like and how big it will be, we can start transferring that information to the cardboard. Use a ruler to measure out the correct dimensions for each piece, and use a pencil to mark those dimension lines.

  14. Gingerbread House STEM Challenge

    Building a gingerbread house is similar to building a real house. As the engineer and architect, you need to plan and design the structure you want to build and make sure it meets all the design requirements. An important aspect of building a house is to make sure that it stays upright and keeps its shape, which is known as its structural ...

  15. Building a house

    Building a house. Why would you use bricks to build a house? In this science worksheet, your child learns about properties of common building materials. SCIENCE | GRADE: K, 1st, 2nd . Print full size . Print full size . Skills Guided inquiry, Learning about building materials, Observational skills, Science experiment to try ...

  16. A Sample Construction Schedule and Custom Home Building Time-Line

    Probably not; most home building projects will take less time, but some will take even more. For example, the timeline for a smaller house, with few options and less detailed finishes, which has been built many times before by professional builders, might be as short as 8 to 12 weeks. However, 6 to 9 months from start to finish is probably a ...

  17. A Step-by-Step Guide to the Home Building Process

    Because of the wide range of insulation types, home sizes, and location climates, the cost of insulation highly varies, ranging from $1.00 to $4.50. The average cost for new home insulation, based on a 2,000-square-foot house, ranges from $2,000 to $10,000; but costs can be as high as $24,000. The good news is that new homes are cheaper to ...

  18. PDF WRITING LESSON YOUR DREAM HOUSE

    84-square-foot house. I wondered, if I had the choice, what I would eliminate from the 1,536-square-foot house where I live now. Dee's article gave me ideas about what I would build if I were 25 years old, working as a ballerina, and building a home. The home I would build would be in a group of 100-square-foot houses or

  19. Create a Tiny House: Exploring Perimeter and Area Project-Based

    Lesson Plan - Step-by-Step Project Guide. Milestone 1: Tiny House Planning. Milestone 2: Creating a Floor Plan. Milestone 3: Creating Furniture to Scale. Milestone 4: Finding Perimeter and Area. Milestone 5: Creating a Professional Floor Plan. Teacher and Student Resources. Materials List for the Projects in this Unit.

  20. 3334 Tyrone Blvd Saint Petersburg, FL 33710 / 2340

    Information about property on 3334 Tyrone Blvd, Saint Petersburg FL, 33710-2340. Find out owner contacts, building history, price, neighborhood | HudwayGlass

  21. Sick Philippe Clement opens up on Hampden pitch, Danilo situation

    Rangers ready for their first Hampden assignment - with the hope of being pitch perfect It was a bunged-up Philippe Clement who presented himself at the Rangers media table on Friday afternoon.

  22. Gabino Iglesias On the Horror Mythos of House of Bone and Rain

    Gabino Iglesias: It was not good [in 1999]. It was a basic story. I was like, "Well, this happened to us and I really wish we had done something more." We didn't, we're not badasses in a ...

  23. Curator Plan, Art House, Saint Petersburg, FL 33701

    The GreatSchools Summary Rating is based on several metrics. Zillow has 4 photos of this $1,359,000 2 beds, 3 baths, 1,911 Square Feet condo home located at Curator Plan, Art House, Saint Petersburg, FL 33701 built in 2024.

  24. Saint Petersburg FL Real Estate & Homes For Sale

    Zillow has 2309 homes for sale in Saint Petersburg FL. View listing photos, review sales history, and use our detailed real estate filters to find the perfect place.

  25. What is the oldest building in Wisconsin?

    The oldest building constructed in and still standing in Wisconsin is believed to be Green Bay's Tank Cottage, now located at 2640 S. Webster Ave. inside the Heritage Hill State Historical Park.

  26. St. Petersburg, FL real estate & homes for sale

    Mobile house for sale. $118,000. 2 bed; 2 bath; 624 sqft 624 square feet; 5200 28th St N Lot 316. Saint Petersburg, FL 33714. View Details. Brokered by Four Star Homes, Inc. new - 10 hours ago new ...